Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
CLC 222 Module 3 Exam Contract Management Questions and Answers (2022) (Verified Answers) €7,80   Ajouter au panier

Examen

CLC 222 Module 3 Exam Contract Management Questions and Answers (2022) (Verified Answers)

 290 vues  2 fois vendu
  • Cours
  • Établissement

CLC 222 Module 3 Exam Contract Management Questions and Answers (2022) (Verified Answers) CLC 222 Module 3 Exam: Contract Management • When reviewing the contract, which of the following shall be reviewed for technical and contractual understanding? (Select all that apply) o Incorrect: The...

[Montrer plus]

Aperçu 1 sur 2  pages

  • 24 janvier 2023
  • 2
  • 2022/2023
  • Examen
  • Questions et réponses
avatar-seller
CLC 222 Module 3 Exam Contract Management Questions
and Answers (2022) (Verified Answers)
CLC 222 Module 3 Exam: Contract Management

• When reviewing the contract, which of the following shall be reviewed for technical and
contractual understanding? (Select all that apply)
o Incorrect: The Statement of Work
• If the COR is monitoring the contract and notices that most of the deliverables are late, this
could be an indicator of a problem with the contractor's ability to perform the contract.
o Correct: True
• A bilateral modification is used to.
o Correct: All of these answers are correct
• When changes are made to a contract, the government must determine if the change is within
?scope.? In plain English that means the work falls under the basic intent of the original
contract.
o Correct: True
• The COR should work with the Contracting Officer if the COR identifies a need to
change the current contract.
o Correct: True
• During negotiations for a proposed change to the contract, the COR may be asked to:
o Correct: All these responses are correct
• When a contractor performs work beyond that required by the contract without a formal
change order and it is perceived that such work was ordered by the Government or caused by
Government fault, this is defined as?
o Correct: Constructive change
• An unauthorized commitment is caused by government personnel obligating the government
without contract authority.
o Correct: True
• The COR should be familiar with all the following areas of a contract:
o Correct: All these statements are correct
• Accounting data is entered at the CLIN level with ACRNS as shorthand for tracking LOAs.
o Correct: True
• The main purpose for the COR to understand the contract and how it is organized is to be
aware of all contractual requirements and deliverables. This knowledge helps the COR
track contractor performance and ensure contractor compliance with the contract as written.
o Correct: True
• One of the main responsibilities of the COR in modifying the contract is to provide the
Contracting Officer with complete documentation on the contract and events that led to
the modification.
o Correct: True
• The program manager for the transportation directorate requested that the COR submit a
request to change the contract. The change is an increase in quantity of 1000 truck tires
costing $225 each, under a fixed price tire contract for 500 tires. Choose the best answer
regarding the scope of this requirement.
o Correct: This increase may not be within the scope of the tire contract.

This study source was downloaded by 100000851646087 from CourseHero.com on 01-24-2023 05:42:13 GMT -06:00


https://www.coursehero.com/collection/37698961/CLC-222-Module-3-Exam-Contract-Managementdocx/

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur ACADEMICAIDSTORE. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €7,80. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

78252 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!

Récemment vu par vous


€7,80  2x  vendu
  • (0)
  Ajouter