APM - PFQ (PFQ) Practice Tests/ APM PFQ Exam Questions & Answers Test Bank_2023. Which of the following is not a stage in an issue resolution process? a. Share the issue with stakeholders. b. Track the issue to closure. c. Escalate to the sponsor. d. Apply change control. A Which of the fol...

[Montrer plus]

Aperçu 4 sur 54  pages

  • 31 mai 2023
  • 54
  • 2022/2023
  • Examen
  • Questions et réponses
avatar-seller
APM - PFQ (PFQ) Practice Tests/ APM PFQ Exam
Questions & Answers Test Bank_2023.
Which of the following is not a stage in an issue resolution process?
a. Share the issue with stakeholders.
b. Track the issue to closure. c. Escalate to the sponsor.
d. Apply change control.
A
Which of the following are challenges for a project manager developing and
leading a project team?
1) Issues and incompatibility amongst team members
2) Getting the right skills and attributes amongst team members
3) Co-location of team members in the same geographic area
4) Lack of accountability of team members
a. 1, 2 & 3
b. 1, 2 & 4
c. 1, 3 & 4
d. 2, 3 & 4
C
Which of the following is an activity in a typical change control process?
a. Recommendation.
b. Justification.
c. Planning.
d. Continuous improvement
A
The purpose of quality assurance is to:
a. provide confidence the project will satisfy the relevant quality standards.
b. determine a set of procedures and standards for project management.
c. inspect, measure and test deliverables and processes.
d. define the scope and specifics of a project's deliverables
A
A project manager might use a PESTLE analysis in order to:
a. mitigate all possible risks to the project.
b. identify and mitigate factors that may affect the project.
c. control technological change during the project.
d. consider team social roles in early stages of the project
B
Which of the following are phases in an iterative project life cycle? 1) Concept 2)
Feasibility 3) Deployment 4) Development
a. 3 and 4 only
b. 1, 2 and 3
c. 1 and 2 only
d. 2, 3 and 4
D

,Which of the following is the responsibility of a project manager?
a. Ensuring a project is aligned to the organisation's strategy.
b. Focusing on project benefits and aligning priorities.
c. Achieving the project's success criteria.
d. Improving process, tools and techniques used in a project
C
To develop and establish a proper communication plan within a project, the
project manager needs to consider which type of analysis?
a. Budget.
b. Stakeholder.
c. Resource.
d. Schedule
B
Which of the following is a responsibility of the project sponsor?
a. Creating a project cost breakdown structure.
b. Authoring the project management plan.
c. Creating a project work breakdown structure.
d. Owning the project business case.
D
Portfolio management includes prioritising:
a. projects and/or programmes that contribute directly to the organisation's
strategic objectives.
b. projects with exceptionally high returns on investment.
c. projects and programmes over business as usual.
d. projects which maximise change over those which maximise investment
A
Which of the following actions would not help a team leader influence the
performance of their team?
a. Creating an exclusive environment.
b. Providing clear roles and responsibilities.
c. Promoting openness and honesty.
d. Developing a trusting relationship.
A
One difference between a project and business as usual is:
a. projects achieve specified benefits but business as usual has only vague
benefits.
b. projects drive change whereas business as usual continues existing activities.
c. projects have tightly controlled budgets whereas business as usual does not.
d. projects have unclear deadlines but business as usual has multiple milestones
B
The purpose of project progress reporting is to:
a. ensure a simpler critical path.
b. enable the tracking of project deliverables.
c. ensure stakeholder acceptance of project deliverables.
d. provide an increased total float.
B

,Which of the following is the purpose of an estimating funnel?
a. Keeping resource usage to a minimum to help reduce costs.
b. Supporting the production of comparative estimates.
c. Identifying where costs can be minimised when preparing a budget.
d. Representing increasing levels of estimating accuracy achieved through the
life cycle
D
One advantage of virtual communications is:
a. that nonverbal signals can have an impact on discussions.
b. it's easy to detect signs of conflict within the project team.
c. access to a wider resource pool for the project.
d. that the project team will always be co-located.
C
Which technique could be used by a project manager when resources are
limited?
a. Resource aggregation.
b. Resource estimation.
c. Resource levelling.
d. Resource expansion
C
The main aim of quality management is to:
a. prepare a high-quality management plan.
b. ensure that deliverables meet appropriate standards.
c. validate the use of consistent standards.
d. determine whether to accept change requests.
B
Which of the following is a purpose of issue management?
a. To stop issues occurring within the project.
b. To address and resolve the issues that occur.
c. To address and resolve uncertainty.
d. To reschedule activities to reduce costs
B
Product breakdown structures illustrate the required scope of work by a
hierarchical structure itemising the:
a. components of each product.
b. budget of each product.
c. benefits of each product.
d. risks of each product.
A
The definition of benefits management includes which key activities?
a. Planning, analysis and integration of project benefits.
b. Justification, validation and acceptance of project benefits.
c. Identification, tracking and realisation of project benefits.
d. Realisation, acceptance and integration of project benefits
C

, Which of the following statements about scheduling is false?
a. Defines the sequence of activities.
b. Considers work calendars and time contingency.
c. Provides a baseline for safety considerations.
d. Quantifies the required resources.
C
Which of the following defines the term 'deployment baseline'?
a. The starting point for creating a resource histogram.
b. The basis for creating an organisational breakdown structure.
c. The starting point for the monitoring of project risks.
d. The basis for progress monitoring.
D
Which of the following is an activity in a typical configuration management
process?
a. Evaluation.
b. Identification.
c. Registration.
d. Justification.
B
Stakeholder analysis supports effective stakeholder engagement by:
a. identifying stakeholders with high levels of power and interest.
b. ensuring stakeholder acceptance of project deliverables.
c. justifying the preferred project option to stakeholders.
d. providing information to all stakeholders.
A
Which of the following is a project?
a. Introducing a new information technology system.
b. Operating a national rail network.
c. Organising ongoing catering in the armed forces.
d. Managing day-to-day security for senior politicians
A
One purpose of a typical project business case is to:
a. carry out earned value analysis.
b. allocate resources to the project.
c. analyse cost-benefit of the project.
d. plan project work packages
C
One disadvantage of physical communication is:
a. its significant environmental impact when compared to other forms of
communication.
b. that no audit trail is available for review at a later date by project team
members.
c. it is reliant on technology being available to all relevant members of the
project.
d. that your body language may not reflect what you're saying when passing on
information

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur ACADEMICAIDSTORE. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €10,96. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

82956 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€10,96  1x  vendu
  • (0)
  Ajouter