Project Management for Engineering, Business and Technology
PRO4801 ASSIGNMENT 4 – 2023
CLOSING DATE: 30 JUNE 2023
Question 4.1
Projects go through many uncertainties. Therefore, projects must be able to adjust. Traditional organisations are ineffective in the face of rapid change. In contrast, project organisations should be organic. Explain what ...
PRM3701 ASSESSMENT 7 2024 SEMESTER 2. One who endorses and lends political support for the completion of a specific project is known as the a. Project manager b. CEO c. Project sponsor d. Project...
PRM3701 ASSIGNMENT 6 SEMESTER 2 2024 QUESTION 1 [15 MARKS] You have been invited to deliver a speech to young graduates about important issues in project management. To educate them...
PRO4801 ASSIGNMENT 6 2024 COMPLETE ANSWERS WITH DIAGRAMS Disappointment over the failure of their previous project has taken root in the minds of senior managers at the PACKS Technology Project compa...
Tout pour ce livre (15)
École, étude et sujet
University of South Africa (Unisa)
PRO4801 - Project Management (PRO4801)
Tous les documents sur ce sujet (69)
Vendeur
S'abonner
Masters
Avis reçus
Aperçu du contenu
PRO4801 ASSIGNMENT 4
- 2023
UNIQUE NUMBER: 791013
DUE DATE: 30 JUNE 2023
,PRO4801 ASSIGNMENT 4 2023
Question 4.1
Projects go through many uncertainties. Therefore, projects must be able to adjust.
Traditional organisations are ineffective in the face of rapid change. In contrast, project
organisations should be organic. Explain what is meant by 'organic' and distinguish how
the different kinds of integrators can enhance interaction, coordination and mutual
adjustments. (20)
"Organic" in project organizations refers to a structure that is adaptable, flexible, and
focuses on integrating sub-units using horizontal relationships. For project organisations to
be organic they must integrate sub-units using horizontal relations and the organizational
structure should be able to suit the unique requirements of the project and the
environment. It is designed to meet the unique requirements of a project and its dynamic
environment, enabling it to adjust and respond to uncertainties effectively (Pinto, 2016).
Organic project organizations are characterized by flexible structures and processes that
allow for effective adjustments in response to uncertainties and changes in the project
environment. Integrators support interactions, coordination, and mutual adjustments within
an organic project organization.
In an organic organization, there is a high degree of interaction and coordination between
different units, and decisions are made quickly and flexibly.
Horizontal Relations: In an organic organization, communication and coordination
are not just limited to vertical relationships between managers and subordinates.
Instead, there is a high degree of horizontal communication and coordination
between different units and departments. This allows for a more flexible and
responsive organization that can adapt to change more easily.
Organizational Structures that suit the unique requirements of the project and the
environment: In an organic organization, the organizational structure is not fixed.
Instead, it is designed to suit the unique requirements of the project and the
environment. This allows the organization to be more adaptable and responsive to
change.
1
, Here is a detailed evaluation of how different types of integrators can enhance
interactions, coordination and mutual adjustments in a project organization:
Liaison Roles:
The liaison role is a specialized person or group that links two or more organization
subunits. In the liaison role of an “inventory controller” - the person performs duties in the
assembly department but also notifies the purchasing department of impending shortages
and keeps track of orders placed. The role relieves the assembly foreman of this
responsibility and, by legitimizing the process, ensures that orders get placed, funded, and
documented.
Liaison roles can enhance communication between different departments and facilitate
coordination and information flow. They are responsible for promoting interaction, ensuring
coordination, and resolving any conflicts that may arise (Turner, 2014). Liaisons can be
internal or external to the project organization, and they are often selected based on their
expertise in the areas of the organization they are responsible for. They act as a central
point of contact and ensure that all relevant parties are involved and informed, thereby
promoting effective interaction and coordination among different units.
In South Africa, infrastructure projects such as the Gauteng Freeway Improvement Project
have used liaison roles to facilitate communication between the South African National
Roads Agency (SANRAL) and various stakeholders, including government departments and
the public.
But the liaison role is not always effective. Although the inventory controller expedites parts
ordering, the reason for part shortages still goes unresolved. To unravel that problem, it
might be necessary to involve people from elsewhere in the company. This is where the
next kind of integrative role, a multifunctional task force or team, comes into play.
Task Force and Teams:
A task force is a temporary group with representatives from several subunits
(multifunctional) that is formed to address a need or solve a problem. When the group
begins addressing the problem, it is, in fact, conducting a project. For example, to address
the shortage problem, the assembly foreman might call together representatives from the
areas of inspection, finance, and purchasing. The task force meets as often and as long as
necessary to solve the problem, and then it disbands. The most effective task forces have
ten or fewer members, a team leader or coordinator, and are short lived.
2
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Masters. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €8,02. Vous n'êtes lié à rien après votre achat.