Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

ACI Concrete Field Testing Technician- Grade I Exam with complete solutions

Note
-
Vendu
-
Pages
11
Grade
A+
Publié le
12-07-2023
Écrit en
2022/2023

ACI Concrete Field Testing Technician- Grade I Exam with complete solutions

Établissement
ACI Concrete
Cours
ACI Concrete









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
ACI Concrete
Cours
ACI Concrete

Infos sur le Document

Publié le
12 juillet 2023
Nombre de pages
11
Écrit en
2022/2023
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

ACI Concrete Field Testing Technician- Grade I Exam with complete solutions
Section 1: Temperature of Freshly Mixed Hydraulic-Cement Concrete - Answer- C1064
The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of _____ into the freshly mixed concrete. - Answer- 3 inches
The temperature measuring device shall be capable of accurately measuring temperature of freshly mixed concrete to _____, throughout a range of _____. - Answer-
+/- 1 °F 30 °F to 120 °F
The temperature measuring device shall be verified _____, or whenever there is a question of _____. - Answer- Annually, accuracy
The temperature of concrete may be measured in a wheelbarrow. True or False? - Answer- True
The temperature of concrete may be measured in a wall form. True of False - Answer- True
A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Answer- False
What must be done to the sample container prior to sampling the concrete? - Answer- Dampen (with water)
What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in the fresh concrete. - Answer- Gently press the concrete around the temperature measuring device at the surface of the concrete
How long must the temperature measuring device remain in the freshly mixed concrete?
- Answer- At least 2 minutes but not more than 5 minutes
After the temperature of the concrete is read, what is required? - Answer- Reporting of temperature
The temperature of concrete is reported to the nearest _____. - Answer- 1 °F
According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer- Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Answer- False
Section 2: Sampling Freshly Mixed Concrete - Answer- C172
The sample of concrete used for temperature determination must be rodded 25 times. True or False? - Answer- False
Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - Answer- Compliance
This method covers sampling from four types of mixtures which are _____, _____, _____, _____, and _____. - Answer- Stationary mixers, Paving mixers, Revolving Drum mixers
Continuous mixers, and Open Top mixers
The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Answer- 15
Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - Answer- True
The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - Answer- 5
The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - Answer- 15
The concrete sample must be protected from contamination and _____. - Answer- Rapid evaporation
The minimum size sample for making strength test specimens is _____. - Answer- 1 ft³
When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Answer- 2
The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - Answer- 5
When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - Answer- 2
€11,53
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
millyphilip West Virginia University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
2827
Membre depuis
3 année
Nombre de followers
1958
Documents
41708
Dernière vente
2 jours de cela
white orchid store

EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

3,7

536 revues

5
234
4
85
3
103
2
31
1
83

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions