Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
WGU - C783 Project Management, Questions and answers, VERIFIED 2024 €12,19   Ajouter au panier

Examen

WGU - C783 Project Management, Questions and answers, VERIFIED 2024

 58 vues  1 fois vendu
  • Cours
  • Établissement

Name the steps in validating a project. - -Validate the business case, and then identify and analyze stakeholders. Name the 9 knowledge areas outlined in the PMBOK Guide. - -Scope, time, cost, quality, human resources, communications, risk, procurement and integration management Name the steps ...

[Montrer plus]

Aperçu 2 sur 10  pages

  • 26 octobre 2023
  • 10
  • 2023/2024
  • Examen
  • Questions et réponses
avatar-seller
WGU - C783 Project Management , Questions and answers, V ERIFIED. Name the steps in valida ting a project. - ✔✔-Validate the business case, and then identify and analyze stakeholders. Name the 9 knowledge areas outlined in the PMBOK Guide. - ✔✔-Scope, time, cost, quality, human resources, communications, risk, procurement and integration manage ment Name the steps in validating a business case. - ✔✔-feasibility study, justification, and alignment to the strategic plan In which project process group is the project charter document created? - ✔✔-Initiating Name the project process group that beg ins when the project charter is approved - ✔✔-Planning This system assures the project doesn't deviate from the planned requirements . - ✔✔-Change control system Name the term that describes processes that are repeated. - ✔✔-Iterative What type of requir ement describes the elements required for a business process? - ✔✔-Business requirements What should come first, the project scope or the project charter? - ✔✔-The project charter. What is the purpose of the project charter? - ✔✔-The project charter norm ally approves the project and authorizes it to begin. What is the lowest level of the WBS? - ✔✔-The work package. These help you determine whether the project is progressing as planned. - ✔✔-Key performance indicators (KPI's) What describes each of the deliverables and their components, the code of accounts identifier, estimates, resources, and criteria for acceptanc e? - ✔✔-The WBS dictionary. Which element of the scope statement documents the process and criteria you'll use to determine whether deliverables are complete and satisfactory? - ✔✔-Success criteria, otherwise known as acceptance criteria. Name the purpos e of the scope management plan. - ✔✔-It documents the procedures for preparing the project scope statement, in other words, the WBS; defines how the deliverables will be verified; and describes the process for controlling scope change requests. Name the f our types of project endings. - ✔✔-Starvation, integration, extinction and addition. This component of the scope statement documents the deliverables or items that will not be included in the project. - ✔✔-Exclusions Before assembling the project team, w hat needs must the project manager assess first? - ✔✔-Skills required by team members. Name the two significant processes you'll perform within the human -resources planning process. - ✔✔-
Organizational planning and staff acquisition This process is where you'll choose team members or organizations who will work on the project. - ✔✔-
Staff acquisition. What are the triple constraints according to CompTIA ? - ✔✔-Time, cost and quality

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Preach. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €12,19. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

78140 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€12,19  1x  vendu
  • (0)
  Ajouter