FDOT Earthwork Level 1
Basics covered in Level 1 -Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way? -Earthwork is the excavation and placement
of soils and materials supporting the proposed roadway.
In Earthwork what is a lift? - 6" of compacted depth at full width
In Ea...
FDOT Earthwork Level 1 Basics covered in Level 1 - ✔✔ Nuclear Testing Speedy Moisture Report Forms Earthwork ha s to do with the roadway in what way? - ✔✔ Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - ✔✔ 6" of compacted depth at full width In Earthwork what is a Lot? - ✔✔ A lot is 1 li ft at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - ✔✔ Done for base, sub grade, and embankment. Sampling is determined how - ✔✔ generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway - ✔✔ Minimum of three representative sample combined. What is LIMS? - ✔✔ Laboratory Info Management System The proctor theory is when compaction is achieved how - ✔✔ by inputting energy to expel air and water in the soil voids Compaction causes - ✔✔ An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and create s what - ✔✔ In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how - ✔✔ Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in - ✔✔ It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how - ✔✔ With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. What is a standard proctor used in - ✔✔ It is u sed in embankment and structure back fill materials Standard proctors are created how - ✔✔ With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance - ✔✔ 2 lbs/pcf What is the STRG - ✔✔ Sampling, Testing, and Reporting Guide (state wide) A job guide schedule is - ✔✔ project specific The material identification number for embankment in the laboratory is - ✔✔ 004L The material identification number for embankment in the field is - ✔✔ 004F The material identification number for base is - ✔✔ 030 PP is short for - ✔✔ project personel
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur PatrickKaylian. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €7,57. Vous n'êtes lié à rien après votre achat.