Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
Recherché précédemment par vous
IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS | ACCURATE AND VERIFIED WITH RATIONALES | UPDATED 2024 | GRADED A | GUARANTEED PASS€20,59
Ajouter au panier
ifma fmp project management exam questions and ans
ifma fmp project management exam questions
ifma fmp project management exam
ifma fmp project management
École, étude et sujet
Ifmp
Ifmp
5
revues
Par: tiburke424 • 3 mois de cela
There were no questions on the test
Par: tedbarroca • 4 mois de cela
Par: DrReiss • 10 mois de cela
accurate and very useful resource. very detailed
Par: RegisteredNurse • 10 mois de cela
VERY ACCURATE. THANKS A LOT
Par: Dredward • 10 mois de cela
Accurate. I passed well . value for money indeed
Vendeur
S'abonner
DrMedinaReed
Avis reçus
Aperçu du contenu
IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS | ACCURATE AND VERIFIED WITH RATIONALES | UPDATED 2024 | GRADED A | GUARANTEED PASS If an organization has narrowed the list of contractors submitting proposals but is still having trouble deciding between them, what could help? - CORRE CT ANSWER The correct answer is: Bidder presentations Which statement is true of the Execute, Monitor and Control phases of the project model? - CORRECT ANSWER The correct answer is: These phases are often concurrently or iteratively performed. Whe n project managers determine the level of data to collect for monitoring and controlling project work, what do they not need to verify? - CORRECT ANSWER The correct answer is: Project work delays due to data collection are scheduled. What do project m anagers submit when they suggest revising the project management plan to make it feasible given the current situation? - CORRECT ANSWER The correct answer is: change order. What is developed to review a final deliverable from an entire system perspect ive? - CORRECT ANSWER The correct answer is: Checklist reviews Which statement is true about the documentation for project closure? - CORRECT ANSWER The correct answer is: Documentation may include operations and maintenance manuals . A project ma nager wants to minimize risk and provide some independent checks and balances on contractor work. Which contract model should the organization use? - CORRECT ANSWER Construction management Your answer is correct. Construction management is the best ch oice because it uses an independent consultant to supervise separate contracts with design firms and construction firms, which allows for some independent review. (Reference: 3 -2-10) According to the critical path method (CPM) of scheduling, what is the critical path for any project? - CORRECT ANSWER the longest set of sequential tasks in the project. Your answer is correct. The critical path is the longest set of sequential tasks in a project and indicates the shortest possible project duration. The critical path is determined using forward pass scheduling followed by backward pass scheduling.(Reference: 3 -2-3) Why does a budget need to be closely integrated with the project sche dule? - CORRECT ANSWER costs are allocated to the period in which they occur. Your answer is correct . Development of the budget requires close integration with the project schedule because costs are allocated to the period in which the costs are incur red. Similarly, budget constraints can require changes to the project schedule such as completing a task more quickly to minimize financing costs. Budgets are produced after schedules. Estimates for costs are made during planning rather than waiting until later.(Reference: 3 -2-5) Which scheduling methods are for activities NOT concurrently performed? - CORRECT ANSWER Traditional waterfall model scheduling Your answer is correct. In forward pass, backward pass, and critical pass scheduling, as many act ivities as possible are concurrently performed, constrained by resource availability and predecessors. The traditional waterfall model does not include these time -saving processes, and therefore it is rarely used for project scheduling.(Reference: 3 -2-3) Which statement is true about the process steps used to build a project schedule? - CORRECT ANSWER Failure to agree on a duration estimate may indicate a need for further task division. Your answer is correct. Failure to come to agreement on an estima te may indicate the task needs to be further broken down. Dependencies are part of sequencing. Knowing the skill levels of personnel affects the length of time required for a task, so determining this is necessary. Sequencing is not performed during work b reakdown structure creation. (Reference: 3 -2-3) Which statement is true of communications management for an office relocation? - CORRECT ANSWER Post -relocation orientation brochures can help employees find their way around. Your answer is correct. Which attribute most accurately describes a project? - CORRECT ANSWER The correct answer is: Projects are finite. What is an example of how project managers apply sound management techniques? - CORRECT ANSWER The correct answer is: they break down a task further if it remains at the same percent completion despite repor ted progress. Which is an advantage of using a standardized project management model? - CORRECT ANSWER The correct answer is: The model is a framework that project managers can adapt to project specifics. In the project model, what do outputs from th e Plan phase become? - CORRECT ANSWER The correct answer is: inputs to the Execute phase.
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur DrMedinaReed. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €20,59. Vous n'êtes lié à rien après votre achat.