Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
WGU - Project Management C783 Test Questions And Answers €11,68   Ajouter au panier

Examen

WGU - Project Management C783 Test Questions And Answers

 64 vues  1 fois vendu
  • Cours
  • WGU C783
  • Établissement
  • WGU C783

WGU - Project Management C783 Test Questions And Answers

Aperçu 2 sur 7  pages

  • 21 janvier 2024
  • 7
  • 2023/2024
  • Examen
  • Questions et réponses
  • WGU C783
  • WGU C783
avatar-seller
WGU - Project Management C783 Test
Questions And Answers
Name the steps in validating a project. CORRECT ANSWERS Validate the business case, and then identify and analyze stakeholders.
Name the 9 knowledge areas outlined in the PMBOK Guide. CORRECT ANSWERS Scope, time, cost, quality, human resources, communications, risk, procurement and integration management
Name the steps in validating a business case. CORRECT ANSWERS feasibility study, justification, and alignment to the strategic plan
In which project process group is the project charter document created? CORRECT ANSWERS Initiating
Name the project process group that begins when the project charter is approved CORRECT ANSWERS Planning
This system assures the project doesn't deviate from the planned requirements. CORRECT ANSWERS Change control system
Name the term that describes processes that are repeated. CORRECT ANSWERS Iterative
What type of requirement describes the elements required for a business process? CORRECT ANSWERS Business requirements
What should come first, the project scope or the project charter? CORRECT ANSWERS
The project charter.
What is the purpose of the project charter? CORRECT ANSWERS The project charter normally approves the project and authorizes it to begin.
What is the lowest level of the WBS? CORRECT ANSWERS The work package.
These help you determine whether the project is progressing as planned. CORRECT ANSWERS Key performance indicators (KPI's)
What describes each of the deliverables and their components, the code of accounts identifier, estimates, resources, and criteria for acceptance? CORRECT ANSWERS The WBS dictionary. Which element of the scope statement documents the process and criteria you'll use to determine whether deliverables are complete and satisfactory? CORRECT ANSWERS Success criteria, otherwise known as acceptance criteria.
Name the purpose of the scope management plan. CORRECT ANSWERS It documents the procedures for preparing the project scope statement, in other words, the WBS; defines how the deliverables will be verified; and describes the process for controlling scope change requests.
Name the four types of project endings. CORRECT ANSWERS Starvation, integration, extinction and addition.
This component of the scope statement documents the deliverables or items that will not be included in the project. CORRECT ANSWERS Exclusions
Before assembling the project team, what needs must the project manager assess first?
CORRECT ANSWERS Skills required by team members.
Name the two significant processes you'll perform within the human-resources planning process. CORRECT ANSWERS Organizational planning and staff acquisition
This process is where you'll choose team members or organizations who will work on the project. CORRECT ANSWERS Staff acquisition.
What are the triple constraints according to CompTIA? CORRECT ANSWERS Time, cost and quality
Name the major elements of a scope document. CORRECT ANSWERS product description, key deliverables, success and acceptance criteria, key performance indicators, exclusions, assumptions, and constraints.
Performing this function on key deliverables results in the WBS. CORRECT ANSWERS Decomposition
An activity that cannot start until its predecessor has concluded is said to have what type of logical relationship? CORRECT ANSWERS Finish-to-start
Name the estimating technique that bases estimates on past projects of similar size and
scope. CORRECT ANSWERS Analogous estimating.
What is the first step in examining a scope deviation request? CORRECT ANSWERS Identify the cause.
What is the most often used logical relationship? CORRECT ANSWERS Finish-to-start

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur ElevatedExcellence. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €11,68. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

62555 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€11,68  1x  vendu
  • (0)
  Ajouter