Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
IQMS Assessment 2024: Project Management Exam Review |Question and Answer| 100% Correct €9,16   Ajouter au panier

Examen

IQMS Assessment 2024: Project Management Exam Review |Question and Answer| 100% Correct

 10 vues  0 fois vendu
  • Cours
  • Project management
  • Établissement
  • Project Management

IQMS Assessment 2024: Project Management Exam Review |Question and Answer| 100% Correct Project Management today is: a. A new technique invented to address complex problems b. A complex set of methods involving multiple stakeholders c. Only useful for large organizations d. A flexible meth...

[Montrer plus]

Aperçu 3 sur 19  pages

  • 17 mai 2024
  • 19
  • 2023/2024
  • Examen
  • Questions et réponses
  • Project management
  • Project management
avatar-seller
IQMS Assessment 2024 : Project Management Exam Review | Question and Answer | 100% Correct Project Management today is: a. A new technique invented to address complex problems b. A complex set of methods involving multiple stakeholders c. Only useful for large organizations d. A flexible method for managing large or small endeavors *Answer* D Three primary objectives of projects? a. Make money, satisfy the customer, keep employees busy b. Follow specifications, satisfy the boss, beat the competition c. Stay within budget, within time constraints, within scope d. Be profitable, maintain reputation, avoid bad publicity *Answer* C The two primary tasks of the Project Manager are what? a. Staying within budget and scope b. Staying on time within budget c. Achieving access and impact for the organization d. Managing tradeoffs and anticipating and addressing risks to the project *Answer* D Universal characteristic of all projects is that projects are: a. Over budget b. Short on time c. Unique d. Difficult *Answer* C If the primary goal of a project is to produce 10 new widget designs, what might be an important ancillary goal? a. Determine skill and creativity level of the design department b. Demonstrate management commitment c. Make a profit d. Get a promotion *Answer* A What is a "Quasi -Project"? a. Project with variable outcomes matrix b. A situation in which all of the three primary project objectives are ill -defined c. Quick, uncomplicated, active service initiatives d. Recently added activity -reporting matrix *Answer* B Most of the credit for developing project management techniques belongs to: a. The military b. Project managers worldwide c. Large multinational organizations in the U.S. d. The project management institute *Answer* A Actual experience with PM indicates that _____ organizations using it claim to experience better customer relations and increase in their ROI. a. Very few... b. About 50 percent c. All of the... d. A majority of... *Answer* D A common negative aspect of implementing PM is... a. Declining profits b. Increased conflict within the organization c. Greater organizational complexity d. Problems with industry partners *Answer* C Project Management has resulted in an overall a. Decline in the use of traditional hierarchical management b. Increase in process improvement programs c. Growth of US industrial output d. Popularity of MBA programs *Answer* A The largest amount of effort applied to a project is during the _____ phase: a. Conception b. Planning, scheduling, monitoring, and control

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur AceTests. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €9,16. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

79650 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€9,16
  • (0)
  Ajouter