Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
CNST Ch.4-6 Quiz || with 100% Correct Answers. €10,43
Ajouter au panier

Examen

CNST Ch.4-6 Quiz || with 100% Correct Answers.

 0 fois vendu
  • Cours
  • CNST Ch.4-6
  • Établissement
  • CNST Ch.4-6

addendum correct answers A change or addition to a contract documents issued after the documents have been released but before the bids are due Change order correct answers Request made by the owner to add or subtract features to the scope of the project resulting in changes to the contract C...

[Montrer plus]

Aperçu 2 sur 5  pages

  • 4 août 2024
  • 5
  • 2024/2025
  • Examen
  • Questions et réponses
  • CNST Ch.4-6
  • CNST Ch.4-6
avatar-seller
CNST Ch.4-6 Quiz || with 100% Correct Answers.
addendum correct answers A change or addition to a contract documents issued after the
documents have been released but before the bids are due

Change order correct answers Request made by the owner to add or subtract features to the scope
of the project resulting in changes to the contract

Contract documents correct answers The drawings, conditions, terms, and specifications setting
forth the requirements for constructing the project.

Guaranteed Maximum Price (GMP) correct answers A contract methodology in which the
contractor is reimbursed for actual costs of materials, labor, equipment, subcontracts, overhead,
and profit up to a maximum fixed-price amount. Any costs over the maximum price shall be
borne by the contractor. Any savings below the maximum price will revert to the owner. This
type of contract is often implemented when design is less than 100 percent complete.

Perspective drawing correct answers A three dimensional drawing representing width length and
height of a structure

as-built drawings correct answers Record drawings completed by the contractor and turned over
to the owner at the end of the project identifying any changes or adjustments made to the
conditions and dimensions of the work relative to the original plans and specifications.

Time and materials correct answers Another name for a cost-plus-fee contract. These are the two
cost factors that are reimbursed under a cost-plus-fee contract. Time equates to the cost of the
labor, and materials equate to the cost of the building products used in the construction.

Commissioning correct answers a process of testing and checking all equipment and systems
within the facility at the end of a project to assure proper functioning and operation. This may
also include the training of owner personnel in the operation and maintenance of the equipment

Punch list correct answers The minor adjustments, repairs, and work items that must be done
before substantial completion can be achieved. The list is prepared jointly by the owner,
architect, and contractor. The architect confirms completion of each item on the list.

Substantial completion correct answers The point at which all punch list work has been
completed and the owner can occupy or take possession of the new facility.

unforseen conditions correct answers Unknown physical conditions at the site that were not
anticipated by the owner or the contractor

Working drawings correct answers The final detail drawings used for construction these are also
called "construction documents" or "contract documents"

, Commitment manager correct answers The practice of being aware of each team members tasks
and deliverables, checking in with them periodically, and helping when needed for the success of
the project

Committed listening correct answers Listening intently to another person to make sure that you
clearly understand what they mean by the words they are speaking without judging, assessing, or
negating what they are saying.

Committed speaking correct answers speaking with intention and purpose, using specific words
to clearly convey your exact meaning

Emotional intelligence correct answers The capacity to be aware of, control, and express one's
emotions, and to handle interpersonal relationships judiciously and empathetically

Integrative thinking correct answers The ability to face constructively the tension of opposing
ideas and, instead of choosing one at The expense of the other, generate a creative resolution of
the tension in the form of a new idea that contains elements of the opposing ideas but is superior
to each

Land development correct answers Changing the landscape to alter landforms, subdivide existing
property, or changing current property usage for new purposes

Land entitlement correct answers The legal process of obtaining approvals from a governing
municipality to allow for the development of a certain building type.

Open book philosophy correct answers A practice of information transparency among all the
project parties which benefits the client by leading to open dialogue, a better understanding of
the design, and its impact on budgets and schedules.

Procurement correct answers Acquisition of goods and services

Reliable promising correct answers Developed by the LCI, reliable promising and personal
commitment making show respect for people and build trust among team members. Reliable
promising creates ownership and responsibility and helps shift the culture from one of "holding
people accountable" to a culture of "being accountable." Reliable promising reduces rework,
defects, and waste—and increases productivity.

Strategic foresight correct answers A planning-oriented practice based on the study of futures
and statistics.

Teaming enterprise correct answers Finding ways to establish a reciprocal working environment
among your most trusted and aligned business and trade partners to create efficiency and
effectiveness.

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur FullyFocus. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €10,43. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

69252 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 15 ans

Commencez à vendre!
€10,43
  • (0)
Ajouter au panier
Ajouté