 14 vues  0 fois vendu
  • Cours
  • AMMO
  • Établissement
  • AMMO

Determine the best course of action by evaluating the potential costs, or risks, of an action and comparing them to the potential benefits or - Answer-rewards. Which three statements about RM are correct? - Answer--RM is the process of identifying, assessing, and controlling risks, and making de...

[Montrer plus]

Aperçu 2 sur 5  pages

  • 8 août 2024
  • 5
  • 2024/2025
  • Examen
  • Questions et réponses
  • AMMO
  • AMMO
avatar-seller
Ammo-54-DL Risk Management and
Preparation of SOPs for Ammo and
Explosives Exam Questions and
Answers
Determine the best course of action by evaluating the potential costs, or risks, of an
action and comparing them to the potential benefits or - Answer-rewards.

Which three statements about RM are correct? - Answer--RM is the process of
identifying, assessing, and controlling risks, and making decisions that balance risk
costs with mission benefits.
-RM focuses on mission accomplishment while reducing hazards that could cause
injury to personnel or damage to equipment.
-RM is critical when performing hazardous tasks like handling ammunition and
explosives.

Which four statements reflect basic RM principles? - Answer--Integrate RM into all
phases of missions and operations.
-Make risk decisions at the appropriate level.
-Accept no unnecessary risk.
-Apply RM cyclically and continuously.

Which two Army publications provide specific information and detailed guidance for
implementing RM policies and procedures throughout the Army? - Answer--ATP 5-19
-DA PAM 385-30

During which phase does research take place? - Answer-Assessment

Which three steps are part of the Management Phase of the risk management process?
- Answer--Develop Controls/Make Risk Decisions
-Implement Controls
- Supervise/Evaluate

Move the five risk management steps into the correct order. - Answer-1. identify
hazards
2. Assess hazards
3. Develop Controls/make risk decisions
4. implement controls
5. supervise/evaluate

In the icy road accident scenario, what is the source of the accident? - Answer-The icy
roadway

, In the icy road scenario, what is the outcome? - Answer-the result of the mechanism
interacting with the source

Which four resources do RM practitioners use to identify potential hazards? - Answer--
Accident Data
-After Action Reviews (AARs)
-Experience and other experts
-War-gaming what-if scenarios

Which hazard assessment tool did OSHA develop to produce detailed written
procedures for safely performing a particular job or process? - Answer-Job hazard
analysis (JHA)

Why does the RM practitioner assess the hazards identified in step 1? - Answer-to
determine the level of risk for each hazard

Match each term to the correct definition. - Answer-A measure of expected loss from a
given hazard - risk
the likelihood a harmful event will occur - probability
the extent of expected harm from an event, in terms of the amount of injury, property
damage, or other mission-impairing effect - severity

Match each term to the correct definition. - Answer-Continuously, regularly, or inevitably
- Frequently
probably will not occur, not impossible - unlikely
several or numerous times or a common occurrence - likely
infrequently - seldom
sporadically or intermittently - occasional

Match each term to the correct definition. - Answer-little or no impact to mission or unit
readiness; minimal injury or damage - negligible
degraded mission capability or unit readiness; lost days due to injury or illness -
moderate
complete mission failure or loss of ability to accomplish mission; death or permanent,
total disability - catastrophic
significantly degraded mission capability or unit readiness; permanent partial disability
or hospitalization of at least three personnel - critical

What is the risk level for a hazard with frequent probability and moderate severity? -
Answer-high

What is the risk level for a hazard with unlikely probability and critical severity? -
Answer-low

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur lectknancy. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €10,29. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

67096 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!

Récemment vu par vous


€10,29
  • (0)
  Ajouter