Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
PRM3701 ASSIGNMENT 1 semester 2 2024 You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to find status reports, changes, and the creation of forecasts? a. Identifying b. De ning €2,72   Ajouter au panier

Examen

PRM3701 ASSIGNMENT 1 semester 2 2024 You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to find status reports, changes, and the creation of forecasts? a. Identifying b. De ning

 18 vues  0 fois vendu
  • Cours
  • Établissement
  • Book

PRM3701 ASSIGNMENT 1 semester 2 2024 You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to find status reports, changes, and the creation of forecasts? a. Identifying b. De ning c. Planning d. Executing e. Closi...

[Montrer plus]

Aperçu 4 sur 112  pages

  • 19 août 2024
  • 112
  • 2024/2025
  • Examen
  • Questions et réponses
avatar-seller
BMZ ACADEMY




BMZ ACADEMY




@061 262 1185/068 053 8213



BMZ ACADEMY 061 262 1185/068 053 8213

,8/19/24, 9:55 AM Assessment 1




UNISA  2024  PRM3701-24-S2  Welcome Message  Assessment 1

QUIZ




Question 1

Not yet answered

Marked out of 1.00




You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to
find status reports, changes, and the creation of forecasts?


a. Identifying

b. Defining

c. Planning

d. Executing

e. Closing

Clear my choice




Question 2
Not yet answered

Marked out of 1.00




The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go
ahead. Match the stages below according to their correct explanation.


Defining Major responsibilities are assigned

Planning What will the budget be

Executing The physical product is produced

Closing Post-project review




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21108002&cmid=941679 1/7

,8/19/24, 9:55 AM Assessment 1

Question 3

Not yet answered

Marked out of 1.00




At first glance project managers perform the same functions as other managers. That is they plan, schedule, motivate and
control. Which activity below is an activity that does not fall under the function of a project manager?


a. Managing a temporary activity

b. Overseeing existing operations

c. Managing a nonrepetitive activity

d. Responsible for time, cost and performance trade-offs

e. Work with a group of outsiders, including vendors and suppliers

Clear my choice




Question 4
Not yet answered

Marked out of 1.00




An operational project is one that


a. must be completed.

b. supports an organizations’ long-run mission.

c. can improve organizational performance.

d. is completed to meet regulatory compliance.

e. always is extremely relevant to the strategic vision of the organization.

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21108002&cmid=941679 2/7

, 8/19/24, 9:55 AM Assessment 1

Question 5

Not yet answered

Marked out of 1.00




The process of assessing "what we are" and deciding and implementing "what we intend to be and how we are going to get
there" is ______________.




a. strategic management

b. vision and mission setting

c. reflection and inquiry

d. goal and objective clarity

e. mission assessment

Clear my choice




Question 6
Not yet answered

Marked out of 1.00




The following are responsibilities of the governance team when managing a portfolio system are listed below. Identify which
option below is not a responsibility


a. deciding how organizational resources are allocated among the different types of projects

b. publishing the priority of every project and ensuring the process is open and free of power politics.

c. evaluating the progress of the projects in the portfolio.

d. constant scanning of the external environment to determine if organizational selection criteria need to be changed.

e. communicating which projects are approved.

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21108002&cmid=941679 3/7

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur BMZAcademy. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €2,72. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

83249 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€2,72
  • (0)
  Ajouter