General crane safety 2024 Question with 100% complete Answers Final Exam When should a tagline be used during lifting operations? A) when lifting a load over or near electrical transmission lines B) to prevent the load from swinging or rotating C) when the supervisor approves their use D) only when lifting the load to extreme heights B) to prevent the load from swinging or rotating What is the weight of a 24 square foot, 2 inch thick aluminum plate with a unit weight of 15 lbs. per square foot of material per inch of thickness? A) 348 pounds B) 720 pounds C) 6,720 pounds D) 60 pounds E) 120 pounds B) 720 pounds The two expiration dates that are of particular importance to crane operators areA) Vehicle registration expiration date B) Hydraulic oil expiration date C) CAC card expiration date D) The certification expiration date of the crane E) The crane operator's license expiration date D) The certification expiration date of the crane E) The crane operator's license expiration date Which of the following is NOT an acceptable method of communication between the signal person and the crane operator? A) Signal Flags B) Direct Voice C) Hand Signals D) Sound-powered Phones E) Approved Radios A) Signal Flags What is a jib boom? A) A boom that is attached to the main boom to allow rotation of the load B) An extension attached to the main boom used when lifting light loads to a higher elevation than that permitted by the main boom C) A boom that is used to lift extremely heavy loads B) An extension attached to the main boom used when lifting light loads to a higher elevation than that permitted by the main boom If you find cracking or flaking paint on a welded joint of a structural component on the boom, you should A) Look closer to see if it is a crack. B) Report it immediately to your supervisor. C) Do nothing as it is not significant. D) Make a mental note to investigate it later. E) Note it on the ODCL, but do not report it. B) Report it immediately to your supervisor. While performing a pre-use check, the operator must check the wire rope system for all of the following EXCEPTA) Excessive corrosion B) Damage of any kind C) Size and grade of wire rope D) Proper sheave movement E) Proper spooling on the drum C) Size and grade of wire rope All of the following are principle parts of an overhead traveling crane EXCEPTA) Operator's cab or pendant control B) End trucks C) Shackles and eyebolts D) Bridge girders E) Trolley with hoisting mechanism C) Shackles and eyebolts If you find a deficiency that will affect the safe operation of the crane during the preoperational check, all of the following actions must be taken EXCEPTA) Operate that specific function again to ensure there is a problem B) Notify your supervisor C) Note the finding on the ODCL D) Secure the crane E) Follow supervisor's instructions A) Operate that specific function again to ensure there is a problem Components that provide protection for operation and maintenance personnel working on or in the path of cranes are? A) Operational Safety Devices B) Alterations/Modifications C) Load Controlling Parts D) Load Bearing Parts E) General Safety Devices E) General Safety Devices When setting up mobile cranes, the minimum clearance between the rotating upper works and fixed objects should be? A) 1 foot B) 2 feet C) 3 feet D) 4 feet E) 5 feet incorrect D) 4 feet The rated load of the hook block installed

Montrer plus Lire moins
Établissement
General Crane Safety
Cours
General crane safety

Aperçu du contenu

General crane safety 2024 Question with 100%
complete Answers Final Exam

When should a tagline be used during lifting operations?
A) when lifting a load over or near electrical transmission lines
B) to prevent the load from swinging or rotating
C) when the supervisor approves their use
D) only when lifting the load to extreme heights
B) to prevent the load from swinging or rotating




What is the weight of a 24 square foot, 2 inch thick aluminum plate with a unit weight of 15
lbs. per square foot of material per inch of thickness?
A) 348 pounds
B) 720 pounds
C) 6,720 pounds
D) 60 pounds
E) 120 pounds
B) 720 pounds




The two expiration dates that are of particular importance to crane operators are-
A) Vehicle registration expiration date
B) Hydraulic oil expiration date
C) CAC card expiration date
D) The certification expiration date of the crane
E) The crane operator's license expiration date

,D) The certification expiration date of the crane
E) The crane operator's license expiration date




Which of the following is NOT an acceptable method of communication between the signal
person and the crane operator?
A) Signal Flags
B) Direct Voice
C) Hand Signals
D) Sound-powered Phones
E) Approved Radios
A) Signal Flags




What is a jib boom?
A) A boom that is attached to the main boom to allow rotation of the load
B) An extension attached to the main boom used when lifting light loads to a higher elevation
than that permitted by the main boom
C) A boom that is used to lift extremely heavy loads
B) An extension attached to the main boom used when lifting light loads to a higher elevation
than that permitted by the main boom




If you find cracking or flaking paint on a welded joint of a structural component on the boom,
you should
A) Look closer to see if it is a crack.
B) Report it immediately to your supervisor.
C) Do nothing as it is not significant.

,D) Make a mental note to investigate it later.
E) Note it on the ODCL, but do not report it.
B) Report it immediately to your supervisor.




While performing a pre-use check, the operator must check the wire rope system for all of
the following EXCEPT-
A) Excessive corrosion
B) Damage of any kind
C) Size and grade of wire rope
D) Proper sheave movement
E) Proper spooling on the drum
C) Size and grade of wire rope




All of the following are principle parts of an overhead traveling crane EXCEPT-
A) Operator's cab or pendant control
B) End trucks
C) Shackles and eyebolts
D) Bridge girders
E) Trolley with hoisting mechanism
C) Shackles and eyebolts




If you find a deficiency that will affect the safe operation of the crane during the pre-
operational check, all of the following actions must be taken EXCEPT-
A) Operate that specific function again to ensure there is a problem
B) Notify your supervisor

, C) Note the finding on the ODCL
D) Secure the crane
E) Follow supervisor's instructions
A) Operate that specific function again to ensure there is a problem




Components that provide protection for operation and maintenance personnel working on or
in the path of cranes are?
A) Operational Safety Devices
B) Alterations/Modifications
C) Load Controlling Parts
D) Load Bearing Parts
E) General Safety Devices
E) General Safety Devices




When setting up mobile cranes, the minimum clearance between the rotating upper works
and fixed objects should be?
A) 1 foot
B) 2 feet
C) 3 feet
D) 4 feet
E) 5 feet
incorrect
D) 4 feet




The rated load of the hook block installed on a crane may limit the crane's lifting capacity.

École, étude et sujet

Établissement
General crane safety
Cours
General crane safety

Infos sur le Document

Publié le
23 août 2024
Nombre de pages
35
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

€10,92
Accéder à l'intégralité du document:

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Faites connaissance avec le vendeur
Seller avatar
EDWARDLEON

Faites connaissance avec le vendeur

Seller avatar
EDWARDLEON Walden University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
5
Membre depuis
1 année
Nombre de followers
2
Documents
551
Dernière vente
4 mois de cela
freelancing

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Documents populaires

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions