AIC Exam 2 Questions & Answers 100% CORRECT 2024/2025 What types of projects establish prevailing wage rates? - ANSWERSFederally Funded Projects Which of the following documents are submitted by the Contractor at Bid opening? - ANSWERSProposal Form, Bid Breakdown, Addendum, Bid Bond & Non-c...

[Montrer plus]

Aperçu 3 sur 28  pages

  • 5 septembre 2024
  • 28
  • 2024/2025
  • Examen
  • Questions et réponses
  • AIC
  • AIC
avatar-seller
AIC Exam 2 Questions & Answers 100%
CORRECT 2024/2025

What types of projects establish prevailing wage rates? - ANSWERSFederally Funded Projects



Which of the following documents are submitted by the Contractor at Bid opening? - ANSWERSProposal
Form, Bid Breakdown, Addendum, Bid Bond & Non-collusive Affidavit



Which document establishes the forms, content, and procedures for submitting the bid proposals? -
ANSWERSInstruction to Bidders



Which of the following documents is normally incorporated by reference? - ANSWERSGeneral Conditions



What is the name of the law principle for referring the Contractor to other documents that are not
contained in the package provided? - ANSWERSIncorporated by Reference



Which document establishes the labor rates on a project? - ANSWERSPrevailing Wage Rate Schedule



Which document contains a description of the alternate(s)? - ANSWERSGeneral Requiremnts



Which document specifies the existing soil conditions? - ANSWERSInformation Available to Bidders



Which document applies to the Contractor and the Subcontractors and describes the administrative,
procedural and temporary procedures on the job site? - ANSWERSGeneral Requirements



Which document specifies the temporary facilities needed on a project? - ANSWERSGeneral
Requirements

,Which document is submitted by each bidder stating that their bid was arrived at without any conferring
with other prime bidders? - ANSWERSNon-Collusive Affidavit



Which document is submitted to the Owner for bid consideration before the Contractor can receive the
bidding documents? - ANSWERSPre-qualification Forms



Which document describes the quality of work and the quality of the materials and the construction
execution procedures? - ANSWERSTechnical Specifications



Which document describes the business procedures for a specific project and they change the initial
procedures? - ANSWERSSupplementary Conditions



Which document specifies the Regulations required such as soil erosion or minorities? -
ANSWERSGeneral Requirements



Which document requests that additional information be submitted by the bidder within 48 hours of bid
opening? - ANSWERSProposal Supplements



Which document issued by the Architect illustrates what is to be built? - ANSWERSPlans



Which document makes changes, modifications and corrections prior to bid openings? -
ANSWERSAddenda



Which documents describe the duties and responsibilities of each party and the business procedures for
administering the contract? - ANSWERSGeneral Conditions



What is the term called which requires all Bidders to include in their bid a specified amount or unit price
for a particular item? - ANSWERSCash Allowance



Which of the following systems is utilized for supporting an existing structure when the new excavation
will be below the existing structures foundation while the extension to the existing foundation is being
placed? - ANSWERSUnderpinning

, What is the lifting system called which consists of two vertical towers with a cross beam on top with the
intended purpose of lifting an unusually long piece of equipment which was transported horizontally and
it is lifted into its permanent vertical position? - ANSWERSJin Pole



What is the concrete pouring method called that is used to pour concrete under water? -
ANSWERSTremie



In construction, what is the proper terminology for transporting the off-road equipment to the job site? -
ANSWERSMobilization



Assume you are lifting an item onto the roof. The Height of the exterior wall is 27 Feet above the ground
and the horizontal distance from the centerline of the rotation is 40 feet. What is the minimum length of
the boom required? - ANSWERS70 Feet



Which of the following temporary systems is utilized to support freshly placed concrete which is poured
on the ground as a slab and lifted up to its final horizontal elevation using hydraulic jacks? - ANSWERSLift
slab form system



Which piece of equipment is most efficient for compacting granular soils such as sand, gravel, and
crushed stone? - ANSWERSSmooth-Wheel Roller



What is the primary cause for a masonry wall to collapse while under construction? - ANSWERSLack of
masonry wall bracing and a change in wind conditions



Assume you are lifting an item onto the bridge deck. The Deck is 27 feet above the ground and the
horizontal distance from the centerline of the rotation is 40 feet. What is the minimum boom angle? -
ANSWERS57



What is the working range of a Clam Shell? - ANSWERS40-54 degrees



Which piece of equipment and attachment would be the most efficient method to excavate inside a
cofferdam? - ANSWERSCrane with a Clamshell attachment

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Bensuda. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €9,70. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

78600 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€9,70
  • (0)
  Ajouter