Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
Recherché précédemment par vous
CMIT ACTUAL EXAM 200 QUESTIONS AND WELL ELABORATED ANSWERS ALREADY A GRADED WITH EXPERT FEEDBACK LATEST VERSION | NEW AND REVISED There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction €19,90
Ajouter au panier
CMIT ACTUAL EXAM 200 QUESTIONS AND WELL ELABORATED ANSWERS ALREADY A GRADED WITH EXPERT FEEDBACK LATEST VERSION | NEW AND REVISED There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction
1 vue 0 fois vendu
Cours
CMIT ACTUAL
Établissement
CMIT ACTUAL
CMIT ACTUAL EXAM 200 QUESTIONS AND WELL
ELABORATED ANSWERS ALREADY A GRADED WITH
EXPERT FEEDBACK LATEST VERSION |
NEW AND REVISED
There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of
construction management practice. However, there are some key...
CMIT ACTUAL EXAM 200 QUESTIONS AND WELL
ELABORATED ANSWERS ALREADY A GRADED WITH
EXPERT FEEDBACK LATEST 2024-2025 VERSION |
NEW AND REVISED
There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of
construction management practice. However, there are some key differences. Which of the following do
not apply to both CM forms?
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
B) Both require that the liabilities and risks assumed by the parties be clearly understood, coordinated,
and stated in the respective contracts.
C) Both forms allow the CM to function in an advisory role for the entire engagement of the CM.
D) Services can vary based on the contractual relationships of the parties and the risks that are assumed.
- CORRECT ANSWER-C) Both forms allow the CM to function in an advisory role for the entire
engagement of the CM.
Construction management had its beginnings in the early to mid-1960's. Which of the following factors
contributed to the initial use of this delivery system?
A) The need to reduce the overall time and cost associated with project delivery.
B) The increasing cost of money and the unpredictability of project funding streams.
C) The changing role of the general contractor and the increasing numbers of specialty trade
contractors.
D) All of the above. - CORRECT ANSWER-D) All of the above.
The General Services Administration, the Department of Health, Education and Welfare (now HHS), and
the Veterans Administration ran into similar difficulties in the use of construction management. Which
of the following was/were common problems for all three agencies?
A) Funding restrictions
B) Claims
C) Change conditions
D) All of the above - CORRECT ANSWER-D) All of the above
,CMAA was formed and incorporated 1982 with its primary focus being the growth and development of
the construction management profession. - CORRECT ANSWER-True
The CMAA Construction Management Standards of Practice is intended as a guide to the range of
services that constitute professional construction management. They seek to meet the documented
need for definitions of what construction management services are, without unduly structuring the
methodologies by which those services are provided by the CM. - CORRECT ANSWER-True
The goals of the Construction Management Association of America (CMAA) include:
A) Setting standards and developing contract documents for construction management practice.
B) Expanding the understanding of the construction management concept and its use in the
marketplace.
C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of federal,
state, and local governments.
D) All of the above. - CORRECT ANSWER-D) All of the above
The fact that an individual is certified or licensed in any other profession does not, per se, establish
him/her as a qualified CM.
True False - CORRECT ANSWER-True
Certification as a CM means the construction management practitioner has "state of the art" knowledge
and capability to practice construction management.
True False - CORRECT ANSWER-False
Recruiting and training are business matters and normally do not involve ethical concerns.
True False - CORRECT ANSWER-False
Construction management is a concept that is susceptible to overselling.
True False - CORRECT ANSWER-True
Failure to provide quality services is a business and not an ethical question.
True False - CORRECT ANSWER-False
,Contracting for adequate fees is both a business and an ethical issue.
True False - CORRECT ANSWER-True
The ethics of the CM profession focus primarily on a CM's relationships in dealing with its clients.
True False - CORRECT ANSWER-True
The possible approaches for delivering a project are virtually unlimited. A key reason for such variations
is:
A) The different roles that can be assumed by project participants.
B) Different forms of contracts and methods of compensation that can be used.
C) The different levels of care, responsibility, and risks assumed by the parties involved.
D) All of the above. - CORRECT ANSWER-D) All of the above
The traditional delivery system is characterized by executing the major phases of a project in:
A) An overlapping concept
B) A linear sequence
C) A fast track method
D) All of the above - CORRECT ANSWER-B) A linear sequence
A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the construction phase is known before construction
starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk belongs to the contractor.
D) All of the above - CORRECT ANSWER-B) Facility features are fully determined & specified.
Design-build and at-risk construction management delivery systems allow the option to fast-track or
phase a project.
True False - CORRECT ANSWER-True
, Most definitions of construction management are similar. However, a contractual definition is not
known until:
A) The legal form of the CM contract is chosen.
B) The specific scope of services to be provided is identified.
C) The relationship of the CM to others and the risks and authority assumed by the parties are clearly
defined.
D) All of the above - CORRECT ANSWER-D) All of the above
21.
In a CM-at-Risk arrangement once construction begins and the CM converts from the professional
advisory role of a CM to the contractual role of a general contractor, the CM has no implied duties of
loyalty and care to the owner.
True False - CORRECT ANSWER-True
The agency CM does not perform design or actual construction work.
True False - CORRECT ANSWER-True
Under the CM-at-Risk delivery method, the owner usually must deal with the hybrid of a construction
manager and a general contractor.
True False - CORRECT ANSWER-True
Under a CM-at-risk contract, which of the following statements are true?
A) The CM, in most cases, holds the trade and/or specialty contracts.
B) The CM has the right to enforce the schedule, pay the trade or subcontractors, and terminate them if
such action becomes necessary.
C) On some CM-at-Risk contracts, the CM has the option of performing portions of the work with its own
resources (unless prohibited by law on certain public projects).
D) All of the above - CORRECT ANSWER-D) All of the above
In considering the differences between agency CM and CM-at-Risk, which one of the following
statements is NOT true?
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur 2024newestexams. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €19,90. Vous n'êtes lié à rien après votre achat.