Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
Data Centre Design Assessment - Part 2 – Project planning essay €13,29
Ajouter au panier

Dissertation

Data Centre Design Assessment - Part 2 – Project planning essay

 0 fois vendu
  • Cours
  • Data Centre Design Assessment - Part 2 – Project
  • Établissement
  • Data Centre Design Assessment - Part 2 – Project

Data Centre Design Assessment - Part 2 – Project planning essay Data Centre Design Assessment - Part 2 – Project planning These assessment tasks provide an opportunity for you to demonstrate the competencies required to plan for the provisioning of a data centre to meet operational and ef...

[Montrer plus]

Aperçu 2 sur 15  pages

  • 1 novembre 2024
  • 15
  • 2024/2025
  • Dissertation
  • Inconnu
  • A+
  • Data Centre Design Assessment - Part 2 – Project
  • Data Centre Design Assessment - Part 2 – Project
avatar-seller
Data Centre Design Assessment -
Part 2 – Project planning
These assessment tasks provide an opportunity for you to
demonstrate the competencies required to plan for the provisioning
of a data centre to meet operational and efficiency goals.

Successful completion of this assessment contributes towards
attaining competency in the following:

ICTICT418 Contribute to copyright, ethics and privacy in
an IT environment
ICTPMG610 Develop a project management plan
ICTSUS601 Integrate sustainability in ICT planning and design
projects ICTPMG611 Prepare a detailed design brief
ICTTEN611 Produce an ICT network architecture

design ICTNWK529 Install and manage complex ICT

networks Tasks

1. Produce a high-level project plan for the design,
implementation, commissioning of the data centre.
References - Schneider Electric
- Data Centre Projects, Schneider Electric - Reference
Design 33, Schneider Electric - Data Centre
commissioning. The project plan should:
1. Show how you will integrate sustainability into the
project

• Reducing the effect by making our activities carbon neutral,
our major objective is to reduce the impact on the
environment.
• Lower IT workloads In most data centres, IT equipment consumes
the most energy, and there are several methods to wherein, mostly
through virtualization, hardware, and software choices, the IT
burden may be
decreased.
• Utilizing renewable energy to drastically reduce carbon emissions is
known as "green energy." Compared to fossil fuels, renewable
energy sources
emit substantially less carbon. If affordable renewable energy is
readily accessible, strong brand positioning, and corporate
social responsibility are supplementary advantages in certain
situations. Off-site renewable energy purchases are frequently
more efficient and practicable.

2. List all project tasks and timelines

Prepare

• Determine what is required: Analyse the demands of the company
• Develop the idea: to fulfill obligations and priorities (Architectural plan)



Design
https://www.coursehero.com/file/169106574/Data-Centre-Design-Assessment-Part-2-Project-planning-DONEdocx/

, This study source was downloaded by 100000884376392 from CourseHero.com on 10-30-2024 15:29:24 GMT -05:00




https://www.coursehero.com/file/169106574/Data-Centre-Design-Assessment-Part-2-Project-planning-DONEdocx/

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Academia199. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €13,29. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

69252 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 15 ans

Commencez à vendre!
€13,29
  • (0)
Ajouter au panier
Ajouté