Design sprint - Guides d'étude, Notes de cours & Résumés

Vous recherchez les meilleurs guides d'étude, notes d'étude et résumés sur Design sprint ? Sur cette page, vous trouverez 526 documents pour vous aider à réviser pour Design sprint.

Page 2 sur 526 résultats

Trier par

PSM Certification Exam Questions With Answers Latest Updated 2024/2025 | Rated A+.
  • PSM Certification Exam Questions With Answers Latest Updated 2024/2025 | Rated A+.

  • Examen • 17 pages • 2024
  • PSM Certification Exam Questions With Answers Latest Updated 2024/2025 | Rated A+. Which statements are correct about Product Backlog refinement? (Choose 2 answers) 1. should be done right before sprint planning 2. scrum master should facilitate it 3. shouldnt take mroe than 10% of dev teams time ple teams may participate - Answer number 3 and 4 Explanation If multiple teams are working on the project, they will participate in the refinement as well. Refinement can take any amount of tim...
    (0)
  • €12,65
  • + en savoir plus
Guidewire Module 2 questions with correct answers
  • Guidewire Module 2 questions with correct answers

  • Examen • 13 pages • 2024
  • 1. What are the different phases in guidewire project Lifecyle? - Correct Answer-Pre-Inception, Inception, Development, Stabilization, Deployment, Support and success 1. Implementing workshop, inception planning, benefit mapping workshop is done in - Correct Answer-Pre-Inception phase Elaborate requirement, confirm scope, plan project/sprint, infrastructure sizing is done in - Correct Answer-Inception phase 1. User stories mapped to business case, project tool identified, business case ...
    (0)
  • €12,18
  • + en savoir plus
MSIS APA Final Exam (Agile)
  • MSIS APA Final Exam (Agile)

  • Examen • 24 pages • 2024
  • MSIS APA Final Exam (Agile) What are the phases of Waterfall? - (1) Planning (2) Analysis (3) Design/Construction (4) Testing (5) Implementation (6) Maintenance What is included in the "planning" phase of Waterfall? - Project Charter, Business Case, Requirements Planning, Project Plan The business case of the "planning" phase in Waterfall is... - Financially Feasible, Quantifiable, Measurable, Observable What is included in the "analysis" phase of Waterfall? - Requirem...
    (0)
  • €9,37
  • + en savoir plus
PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct
  • PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct

  • Examen • 24 pages • 2024
  • PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct Which of the following is an example of an increment? A design for the product. A plan for the overall product release. A mock-up of the product marketing materials. A valuable, useful set of product features. A product roll-out plan. All of the Above - Answer ️️ -A valuable, useful set of product features A products success is measured by? (Select Three) The impact on my performance rating. The impact ...
    (0)
  • €11,71
  • + en savoir plus
PSPO I Study Guide
  • PSPO I Study Guide

  • Examen • 15 pages • 2023
  • Which of the following is an example of an increment? A design for the product. A plan for the overall product release. A mock-up of the product marketing materials. A valuable, useful set of product features. A product roll-out plan. All of the Above - Answer- A valuable, useful set of product features A products success is measured by? (Select Three) The impact on my performance rating. The impact on revenue. The impact on customer satisfaction. The impact on my boss's mood. ...
    (0)
  • €11,71
  • + en savoir plus
Mendix- Rapid Developer Exam 100% Accurate
  • Mendix- Rapid Developer Exam 100% Accurate

  • Examen • 4 pages • 2023
  • Which tool can you use for Online Project Management in Mendix? - ANSWER The Mendix Developer Portal What does the round Mendix badge on your profile represent? - ANSWER Your Mendix certification level Where's the best place to find the latest information regarding the default design language used by Mendix apps? - ANSWER Check the latest updates on the Atlas UI site Which of the following is a place where you can see news regarding the latest features of the Mendix platform? - ANSWER ...
    (0)
  • €9,37
  • 1x vendu
  • + en savoir plus
PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct
  • PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct

  • Examen • 24 pages • 2024
  • PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct Which of the following is an example of an increment? A design for the product. A plan for the overall product release. A mock-up of the product marketing materials. A valuable, useful set of product features. A product roll-out plan. All of the Above - Answer ️️ -A valuable, useful set of product features A products success is measured by? (Select Three) The impact on my performance rating. The impact ...
    (0)
  • €11,71
  • + en savoir plus
PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct
  • PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct

  • Examen • 24 pages • 2024
  • PSPO I Study Guide with Complete Solutions | Verified & Updated | 100% Correct Which of the following is an example of an increment? A design for the product. A plan for the overall product release. A mock-up of the product marketing materials. A valuable, useful set of product features. A product roll-out plan. All of the Above - Answer ️️ -A valuable, useful set of product features A products success is measured by? (Select Three) The impact on my performance rating. The impact ...
    (0)
  • €11,71
  • + en savoir plus
Guidewire Module 2 verified already passed
  • Guidewire Module 2 verified already passed

  • Examen • 11 pages • 2024
  • Guidewire Module 21. What are the different phases in guidewire project Lifecyle? - correct answer Pre-Inception, Inception, Development, Stabilization, Deployment, Support and success 1. Implementing workshop, inception planning, benefit mapping workshop is done in - correct answer Pre-Inception phase Elaborate requirement, confirm scope, plan project/sprint, infrastructure sizing is done in - correct answer Inception phase 1. User stories mapped to business case, project tool ident...
    (0)
  • €16,87
  • + en savoir plus
PSM Certification Exam Questions With Answers Latest Updated 2024/2025 | Scored A+
  • PSM Certification Exam Questions With Answers Latest Updated 2024/2025 | Scored A+

  • Examen • 17 pages • 2024
  • Who's responsible for Gantt Charts in Scrum? - Answer No one Explanation Gantt Chart is not a Scrum artifact and not compatible with the framework. Which statements are correct about Product Backlog refinement? (Choose 2 answers) 1. should be done right before sprint planning 2. scrum master should facilitate it 3. shouldnt take mroe than 10% of dev teams time ple teams may participate - Answer number 3 and 4 Explanation If multiple teams are working on the project, they will particip...
    (0)
  • €14,53
  • + en savoir plus