Agile case - Guides d'étude, Notes de cours & Résumés

Vous recherchez les meilleurs guides d'étude, notes d'étude et résumés sur Agile case ? Sur cette page, vous trouverez 845 documents pour vous aider à réviser pour Agile case.

All 845 résultats

Trier par

SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update Très apprécié
  • SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update

  • Examen • 18 pages • 2024
  • SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update When should a Lean portfolio be established? When it is necessary to operate in a completely decentralized environment When it is part of training the executives When the lack of alignment between strategy and execution impacts value delivery When there is a minimum of six Agile Release Trains (ARTs) that require coordination Which activity is associated with the r...
    (2)
  • €17,71
  • 10x vendu
  • + en savoir plus
Solution Manual for Project Management The Managerial Process 8th  By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+ Solution Manual for Project Management The Managerial Process 8th  By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+ Très apprécié
  • Solution Manual for Project Management The Managerial Process 8th By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+

  • Examen • 599 pages • 2024 Très apprécié
  • Solution Manual for Project Management The Managerial Process 8th By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+ Chapter Outline 1. What Is a Project? A. What a Project Is Not B. Program versus Project C. The Project Life Cycle D. The Project Manager E. Being Part of a Project Team 2. Agile Project Management 3. Current Drivers of Project Management A. Compression of the Product Life Cycle B. Knowledge Explosion C. Triple Bottom Line (Pl...
    (0)
  • €12,79
  • 5x vendu
  • + en savoir plus
Thomas More - Process and Project Management -  Agile Case
  • Thomas More - Process and Project Management - Agile Case

  • Cas • 12 pages • 2023
  • School: Thomas More Course: Project and Process Management Lecturer: Jansen Maarten Content: Agile Case Copyright warning: Reproduction and distribution of this document without the written permission of the author is prohibited.
    (1)
  • €10,99
  • 3x vendu
  • + en savoir plus
Test Bank for Systems Analysis and Design, 8th Edition by Dennis, Wixom
  • Test Bank for Systems Analysis and Design, 8th Edition by Dennis, Wixom

  • Examen • 263 pages • 2023
  • Test Bank for Systems Analysis and Design, 8th Edition 8e by Alan Dennis, Barbara Wixom, Roberta M. Roth. Full Chapters test bank are included - Chapter 1 to 13 1 The Systems Analyst and Information Systems Development, 3 Introduction, 4 The Systems Analyst, 6 Systems Analyst Skills, 6 Systems Analyst Roles, 7 The Systems Development Life Cycle, 8 Planning, 10 Analysis, 11 Design, 12 Implementation, 12 Project Identification and Initiation, 13 System Reques...
    (0)
  • €39,37
  • 10x vendu
  • + en savoir plus
SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update
  • SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update

  • Examen • 18 pages • 2024
  • SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update SAFe SPC 6.0 Final Exam Questions & Answers 2024 Update When should a Lean portfolio be established? When it is necessary to operate in a completely decentralized environment When it is part of training the executives When the lack of alignment between strategy and execution impacts value delivery When there is a minimum of six Agile Release Trains (ARTs) that require coordination Which activity is associated with the r...
    (0)
  • €17,71
  • 4x vendu
  • + en savoir plus
Solutions for Systems Analysis and Design, 8th Edition by Alan Dennis
  • Solutions for Systems Analysis and Design, 8th Edition by Alan Dennis

  • Examen • 338 pages • 2023
  • Complete Solutions Manual for Systems Analysis and Design 8e 8th Edition by Alan Dennis, Barbara Wixom, Roberta M. Roth. Full Chapters Solutions are included - Chapter 1 to 13 1 The Systems Analyst and Information Systems Development, 3 Introduction, 4 The Systems Analyst, 6 Systems Analyst Skills, 6 Systems Analyst Roles, 7 The Systems Development Life Cycle, 8 Planning, 10 Analysis, 11 Design, 12 Implementation, 12 Project Identification and Initiation, 13 ...
    (0)
  • €29,03
  • 2x vendu
  • + en savoir plus
Solution Manual for Project Management The Managerial Process 8th By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+ Solution Manual for Project Management The Managerial Process 8th By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+
  • Solution Manual for Project Management The Managerial Process 8th By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+

  • Examen • 599 pages • 2024
  • Solution Manual for Project Management The Managerial Process 8th By Eric W Larson, Clifford F. Gray 2024 | All Chapters ( 1-16) With Appendix A,B,C & D || A+ Chapter Outline 1. What Is a Project? A. What a Project Is Not B. Program versus Project C. The Project Life Cycle D. The Project Manager E. Being Part of a Project Team 2. Agile Project Management 3. Current Drivers of Project Management A. Compression of the Product Life Cycle B. Knowledge Explosion C. Triple Bottom Line (Planet, People,...
    (0)
  • €11,80
  • 1x vendu
  • + en savoir plus
WGU D333 Ethics in Technology – Exam Questions and answers, latest Update.
  • WGU D333 Ethics in Technology – Exam Questions and answers, latest Update.

  • Examen • 37 pages • 2023
  • WGU D333 Ethics in Technology – Exam Questions and answers, latest Update. acceptable use policy (AUP) A document that stipulates restrictions and practices that a user must agree in order to use organizational computing and network resources. acceptance When an organization decides to accept a risk because the cost of avoiding the risk outweighs the potential loss of the risk. A decision to accept a risk can be extremely difficult and controversial when dealing with safety-critical sy...
    (2)
  • €10,33
  • 3x vendu
  • + en savoir plus
Guidewire Associate Exam Questions and Answers 100% Solved
  • Guidewire Associate Exam Questions and Answers 100% Solved

  • Examen • 16 pages • 2023
  • Guidewire Associate Exam Questions and Answers 100% Solved What are the four main areas of configuration in a Guidewire application? 1. User Interface 2. Data Model 3. Application Logic 4. Integration What are some of the technologies used in InsuranceSuite applications? Page Configuration Format (PCF) files Gosu (programming language) What are some reasons for a non-developer to understand the technology stack? To determine what data is stored and if new requirements need additional d...
    (0)
  • €9,83
  • 4x vendu
  • + en savoir plus
WGU D333 Ethics in Technology| Latest Update| Correct 100
  • WGU D333 Ethics in Technology| Latest Update| Correct 100

  • Examen • 30 pages • 2023
  • acceptable use policy (AUP) - ANSWERSA document that stipulates restrictions and practices that a user must agree in order to use organizational computing and network resources. acceptance - ANSWERSWhen an organization decides to accept a risk because the cost of avoiding the risk outweighs the potential loss of the risk. A decision to accept a risk can be extremely difficult and controversial when dealing with safety-critical systems because making that determination involves forming persona...
    (1)
  • €14,56
  • 3x vendu
  • + en savoir plus