Summary CPMGT Week 4.docx CPMGT/300 Project Schedule CPMGT/300 A work breakdown structure, better known as a WBS and a list of project requirements have characteristics that are the same but does in fact serve two different purposes. A list of project req€7,35
In winkelwagen
Summary CPMGT Week 4.docx CPMGT/300 Project Schedule CPMGT/300 A work breakdown structure, better known as a WBS and a list of project requirements have characteristics that are the same but does in fact serve two different purposes. A list of project req
11 keer bekeken 0 keer verkocht
Vak
University Of Phoenix UoP
Instelling
University Of Phoenix
CPMGT Week CPMGT/300 Project Schedule CPMGT/300 A work breakdown structure, better known as a WBS and a list of project requirements have characteristics that are the same but does in fact serve two different purposes. A list of project requirements is a written list of standards or bounda...
cpmgt week 4docx cpmgt300 project schedule cpmgt300 a work breakdown structure
better known as a wbs and a list of project requirements have characteristics that are the same but does in fa
Geschreven voor
University Of Phoenix
University Of Phoenix UoP
Alle documenten voor dit vak (3705)
Verkoper
Volgen
helperatsof1
Ontvangen beoordelingen
Voorbeeld van de inhoud
CPMGT/300
Project Schedule
CPMGT/300
A work breakdown structure, better known as a WBS and a list of project
requirements have characteristics that are the same but does in fact serve two different
purposes. A list of project requirements is a written list of standards or boundaries that
should be followed to complete a project successfully. According to science direct, “some
project requirements that must be defined are the project start date, scope, boundaries of the
work, constraints in resources and
people, project environment, deliverables, and budget.” A work break down structure
according to work break down structure “Work Breakdown Structure (WBS) is the tool that
utilizes this technique and is one of the most important project management documents. It
singlehandedly integrates scope, cost and schedule baselines
ensuring that project plans are in alignment.”
A work break down structure is more detailed for the specific project to be completed.
This structure shows how each duty should be completed, not exactly step by step but by
details being given. Whereas a list of project requirements would be broader for any project
of that sort not in specifics. A list focuses on the must haves and the boundaries and a WBS
is a detailed layout of a specific project.
The importance of forming a work breakdown structure reflects on the outcome on the
project. A WBS is very detailed by levels and body, because is ensures that plans are in
alignment. For example, if we are building a house a work break down structure shows how
each level of building a home should be completed. When building a house, first come the
foundation and the laying of plumbing pipes. Secondly, when building a home is wiring the
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
√ Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper helperatsof1. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €7,35. Je zit daarna nergens aan vast.