100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Overig

Getta_Byte_Software_project Week 4 Week 4: Course Project Part 2

Beoordeling
-
Verkocht
-
Pagina's
14
Geüpload op
18-04-2023
Geschreven in
2022/2023

Getta Byte Software project 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of substituting the on-going manual online-based billing system that will enable a concise, easy, and fast data entry system. It is worth noting that the existing system has the capability of helping the company to carry out the duties in daily operations. This is quite fine, but there are a few challenges that call for an online system. The first concern is that the existing system is manual and, therefore, time-consuming and very inaccurate. A lot of time is needed in entering the information into the system, and the result is the inconsistency of the data entered and, therefore, putting the company at risk. The solution to this problem is to come up with an automated system that shall be very fast and produce accurate data. The system shall be base on the online operation, which will enhance an easy way of entering the data, conceive a dynamic update towards the receivables. The system shall have a goal of saving up to 25 % of the total labor per month since human resources to operate the billing system shall be reduced. The extra cost saved by the company shall be used elsewhere and hence, raising the total profits made by the company each month. The project focuses on working with a bunch of people to spread risks in the company. These people shall include the CFO, CEO, the billing department, and also customer care services. The success of the project shall be attributed to the fact that the billing cycles are reduced to more than 30% each month. As per the project schedule, it is expected that the first piloting shall be done by September 1 st. This shall imply that the development and testing of the software shall be done by 15th August. This shall give ample time to facilitate the first piloting study and see if the system is working correctly and in accordance to the expectations and goals of the project. The final real ease of the software shall be done by September 1st, this will be after having checked all parts that are not in a good working condition and rectify them accordingly. The project is budgeted $ 250, 000 for the entire work. Therefore, the work shall be scheduled accordingly, and individual tasks split to enable the project team to carry out all duties with little or no friction. 1.2 Management of the project The project charter shall establish the needs of the project and the basic needs of the project. Besides, the person who shall be liable for carrying out the entire project is the project manager. The project manager shall then appoint their teams, such as the human resource manager, the software engineer, the project coordinator, and other different people who shall carry out duties assigned to them by the project manager. Each person shall be responsible in their area of operation to make sure that there is a smooth running of activities. The project manager role shall be to oversee the entire process and therefore, provide all the resources, including the human resource, material and cost that shall be used in the project. The project manager will also ensure that communication is done and there is adequate control of all the resources provided.

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
18 april 2023
Aantal pagina's
14
Geschreven in
2022/2023
Type
Overig
Persoon
Onbekend

Onderwerpen

€13,27
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
leedia Yale School Of Medicine
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
31
Lid sinds
3 jaar
Aantal volgers
26
Documenten
881
Laatst verkocht
4 maanden geleden

4,3

3 beoordelingen

5
2
4
0
3
1
2
0
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen