CTQP Final Estimates Level 1 Questions and Answers(A+ Solution guide)
1) A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - Answer True For the DOT, the management of Construction and reconstruction projects involves the following specific responsibilities: A. Planning, Programming and design B. Contract administration C. Contractor payments D. Design and Contract Management E. All of the above - Answer E. All of the above 3) To pay for the work performed by Contractors, progress and Final Estimates are needed. True or False? - Answer True DESIGN STANDARDS - Answer These standards are made available for Design, Construction, Maintenance, and Utility operations on the State Highway System. This booklet provides guidelines and technical drawings for design and Construction personnel. SUPPLEMENTAL AGREEMENTS (SA) - Answer SA'S are work of a different characteristic from that shown in the original plans and contract; such as to clarify the Specifications, or pay for unforeseen work. WORK ORDERS (WO) - Answer WO's are similar to SA's but can't be used in all instances. They are used to include additional work into the original contract, and to do minor changes. JOINT PARTICIPATION AGREEMENTS (JPA) - Answer JPA's or Locally Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID Number. They are legal documents between the Department and other government or private entities. The work would be a utility relocations or installations, etc. 1) Multiple choice. Which of the following is NOT officially considered to be a "Contract Document"?A. Supplemental Agreements and Work Orders. B. Notebooks and Estimates Procedure Manual. C. Standard Specifications. D. Construction Manual. E. Answers B &D - Answer E. Answer B & D 2) Multiple choice. Between printings of the Standard Specifications, what does the Department publish to identify and describe changes in the Specifications? A. CPAM B. Supplemental Specifications C. Work orders D. Specifications Changes - Answer B Supplemental Specifications
Geschreven voor
- Instelling
- CTQP
- Vak
- CTQP
Documentinformatie
- Geüpload op
- 19 november 2023
- Aantal pagina's
- 9
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
ctqp