100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A €21,96   In winkelwagen

Tentamen (uitwerkingen)

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A

1 beoordeling
 2 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UPDATED 2024 | GRADED A IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED WITH RATIONALES UP...

[Meer zien]

Voorbeeld 3 van de 24  pagina's

  • 7 mei 2024
  • 24
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden

1  beoordeling

review-writer-avatar

Door: DrReiss • 3 maanden geleden

This made me pass my test ,,,,,,i appreciate the document

avatar-seller
IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED WITH RATIONALES UPDATED
2024 | GRADED A

If an organization has narrowed the list of contractors submitting
proposals but is still having trouble deciding between them, what could
help? - CORRECT ANSWER The correct answer is: Bidder
presentations

Which statement is true of the Execute, Monitor and Control phases of the
project model? - CORRECT ANSWER The correct answer is: These
phases are often concurrently or iteratively performed.

When project managers determine the level of data to collect for
monitoring and controlling project work, what do they not need to
verify? - CORRECT ANSWER The correct answer is: Project work
delays due to data collection are scheduled.

What do project managers submit when they suggest revising the
project management plan to make it feasible given the current
situation? - CORRECT ANSWER The correct answer is: change
order.

What is developed to review a final deliverable from an entire
system perspective? - CORRECT ANSWER The correct
answer is: Checklist reviews

Which statement is true about the documentation for project closure? -
CORRECT ANSWER The correct answer is: Documentation may
include operations and maintenance manuals.

A project manager wants to minimize risk and provide some
independent checks and balances on contractor work. Which contract
model should the organization use? - CORRECT ANSWER
Construction management Your answer is correct.

Construction management is the best choice because it uses an
independent consultant to supervise separate contracts with design
firms and construction firms, which allows for some independent
review. (Reference: 3-2-10)

, IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED WITH RATIONALES UPDATED
2024 | GRADED A


According to the critical path method (CPM) of scheduling, what is the
critical path for any project? - CORRECT ANSWER the longest set of
sequential tasks in the project. Your answer is correct.

The critical path is the longest set of sequential tasks in a project and
indicates the shortest possible project duration. The critical path is
determined using forward pass scheduling followed by backward pass
scheduling.(Reference: 3-2-3)

, IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED WITH RATIONALES UPDATED
2024 | GRADED A

Why does a budget need to be closely integrated with the project
schedule? - CORRECT ANSWER costs are allocated to the period in
which they occur. Your answer is correct.

Development of the budget requires close integration with the project
schedule because costs are allocated to the period in which the costs are
incurred. Similarly, budget constraints can require changes to the
project schedule such as completing a task more quickly to minimize
financing costs. Budgets are produced after schedules. Estimates for
costs are made during planning rather than waiting until
later.(Reference: 3-2-5)

Which scheduling methods are for activities NOT concurrently
performed? - CORRECT ANSWER Traditional waterfall model
scheduling Your answer is correct.

In forward pass, backward pass, and critical pass scheduling, as many
activities as possible are concurrently performed, constrained by
resource availability and predecessors. The traditional waterfall model
does not include these time-saving processes, and therefore it is rarely
used for project scheduling.(Reference: 3-2-3)

Which statement is true about the process steps used to build a project
schedule? - CORRECT ANSWER Failure to agree on a duration
estimate may indicate a need for further task division. Your answer is
correct.

Failure to come to agreement on an estimate may indicate the task
needs to be further broken down. Dependencies are part of sequencing.
Knowing the skill levels of personnel affects the length of time required
for a task, so determining this is necessary. Sequencing is not
performed during work breakdown structure creation. (Reference: 3-2-
3)

Which statement is true of communications management for an office
relocation? - CORRECT ANSWER Post-relocation orientation brochures

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper erickarimi. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €21,96. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 77858 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


€21,96
  • (1)
  Kopen