NC Building Contractor License Study
Guide with Complete Solutions
Prime Contractor - Answer✔️✔️-The ______asummes the entire responsibility
under the contract
Sub Contractor - Answer✔️✔️-The ______ asummes responsibility with respect to
his portion of the work
6ft - Answer✔️✔️-Safety Belts shall be a min of 1/2 inch nylon and not allow a fall
greater than ____
8ft - Answer✔️✔️-Safety Nets must extend _____ beyond the end of work surface
25ft - Answer✔️✔️-Safety Nets must be positioned no more than _____ below work
surface
10ft - Answer✔️✔️-Heaters must not be located within ______ft of tarps, canvas or
similar coverings
10ft - Answer✔️✔️-Material Storage : Materials shall not be stored within ____ ft of
an exterior wall
1
,©PREP4EXAMS 2024/2025 REAL EXAM DUMPS Tuesday, August 6, 2024 10,57 AM
7ft - Answer✔️✔️-Materaial Storage : Brick stacks shall not be more than _____ft in
height
6ft - Answer✔️✔️-Material Storage : When masonry blocks are stacked higher than
_____ ft the stack shall be tapered back 1 half block per tier above the ____ft line
20ft - Answer✔️✔️-Material Storage : Lumber Piles shall not exceed ______ft in
height (mechanically)
16ft - Answer✔️✔️-Material Storage - Lumber piles shall not exceed _____ in
height (manually)
20ft - Answer✔️✔️-A chute is required if waste material is dropped more than
_____ft outside exterior walls of building
8 Inches - Answer✔️✔️-How far do you Lap Durawire
Confined - Answer✔️✔️-workers in _____ spaces must be provided a lifeline/safety
belt
Catenary Scaffold - Answer✔️✔️-means a suspension scaffold consisting of a
platform supported by two essentially horiztonal & parallel ropes attached to
structural members of a building or other structure
2
,©PREP4EXAMS 2024/2025 REAL EXAM DUMPS Tuesday, August 6, 2024 10,57 AM
Prescription Lenses - Answer✔️✔️-employer ensures that employees who wear
presc lenses while engaged in operations needing eye protection
12ft - Answer✔️✔️-Maximum height of a masonry pier used in a seismic zone is
_____
Float (Ship) Scaffold - Answer✔️✔️-means a suspension scaffold consisting of a
braced platform resin on two parallel bearers & hung from overhead supports by
ropes of fixed length
Lack Of Maintenance - Answer✔️✔️-The leading reason for erosion and sediment
conrol plan failure is _____
Potable Water & Detergents - Answer✔️✔️-To clean masory use _______
Wood Girders : Wood - Answer✔️✔️-No Masonry shall be supported on ______ or
other forms of _____ construction
Roof Diaphragms : 15 Inches - Answer✔️✔️-_______ Shall be anchored to masonry
walls with 1/2" diameter bolts 6ft on center or equivalent. Bolt shall extend & be
embedded at least _____ in the masonry
8 Inches - Answer✔️✔️-Minimum thickness of a parapet wall
24 Inches - Answer✔️✔️-Maximum spacing of light gauge studs
3
, ©PREP4EXAMS 2024/2025 REAL EXAM DUMPS Tuesday, August 6, 2024 10,57 AM
TRUE - Answer✔️✔️-Mechanicla connections shall have the bars connection to
develop in tension or compression as least 125% of the yield strength of the bar
No - Answer✔️✔️-Is a hardhat required with a jack hammer?
42" Reflectorized Barrell or Drum - Answer✔️✔️-What is preferred safety traffic
marker?
A penetrometer - Answer✔️✔️-What is used to measure soil bearing capactiy?
Lap durawire 8 inches - Answer✔️✔️-Lap durawire 8 inches
3 times - Answer✔️✔️-Unreinforced masonry parapet wall heights shall not exceed
_____ their thickness
6 Inches - Answer✔️✔️-Minimum thickness of a masonry bearing wall - One Story
8 inches - Answer✔️✔️-Minimum thickness of a masonry bearing wall - More than
One Story
4.5 Sq Ft - Answer✔️✔️-There shall be at least one metal tile for each ______ of
wall area
24 Inches - Answer✔️✔️-Vertical Spacing on Metal Wall Tie
36 Inches - Answer✔️✔️-Horiztonal Spacing on Metal Wall Tie