WGU C783 PROJECT MANAGEMENT EXAM LATEST ACTUAL EXAM VERSION A AND PRACTICE TEST COMPLETE 350 QUESTIONS AND CORRECT ANSWERS JUST RELEASED | click on ALSO AVAILABLE IN PACKAGE DEAL. You'll get more for less!" €22,11   In winkelwagen

Tentamen (uitwerkingen)

WGU C783 PROJECT MANAGEMENT EXAM LATEST ACTUAL EXAM VERSION A AND PRACTICE TEST COMPLETE 350 QUESTIONS AND CORRECT ANSWERS JUST RELEASED | click on ALSO AVAILABLE IN PACKAGE DEAL. You'll get more for less!"

 0 keer bekeken  0 aankoop
  • Vak
  • WGU C783 PROJECT MANAGEMENT
  • Instelling
  • WGU C783 PROJECT MANAGEMENT

SHOP MORE FOR LESS AMAZING DEAL!! Great news for you! For a more affordable option with extra details, click on ALSO AVAILABLE IN PACKAGE DEAL. You'll get more for less!"

Voorbeeld 4 van de 131  pagina's

  • 19 september 2024
  • 131
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • WGU C783 PROJECT MANAGEMENT
  • WGU C783 PROJECT MANAGEMENT
avatar-seller
Page 1 of 131




WGU C783 PROJECT MANAGEMENT EXAM LATEST
2024-2025 ACTUAL EXAM VERSION A AND PRACTICE
TEST COMPLETE 350 QUESTIONS AND CORRECT
ANSWERS JUST RELEASED
WGU C783 PROJECT MANAGEMENT EXAM A

Q: What describes each of the deliverables and their components, the code of accounts
identifier, estimates, resources, and criteria for acceptance? - ANSWER-The WBS dictionary.



Q: Which element of the scope statement documents the process and criteria you'll use to
determine whether deliverables are complete and satisfactory? - ANSWER-Success criteria,
otherwise known as acceptance criteria.



Q: Name the purpose of the scope management plan. - ANSWER-It documents the procedures
for preparing the project scope statement, in other words, the WBS; defines how the
deliverables will be verified; and describes the process for controlling scope change requests.



Q: Name the four types of project endings. - ANSWER-Starvation, integration, extinction and
addition.



Q: This component of the scope statement documents the deliverables or items that will not be
included in the project. - ANSWER-Exclusions

Q: Name the steps in validating a project. - ANSWER-Validate the business case, and then
identify and analyze stakeholders.



Q: Name the 9 knowledge areas outlined in the PMBOK Guide. - ANSWER-Scope, time, cost,
quality, human resources, communications, risk, procurement and integration management



1

,Page 2 of 131




Q: Name the steps in validating a business case. - ANSWER-feasibility study, justification, and
alignment to the strategic plan



Q: In which project process group is the project charter document created? - ANSWER-Initiating



Q: Name the project process group that begins when the project charter is approved -
ANSWER-Planning



Q: This system assures the project doesn't deviate from the planned requirements. - ANSWER-
Change control system



Q: Name the term that describes processes that are repeated. - ANSWER-Iterative



Q: What type of requirement describes the elements required for a business process? -
ANSWER-Business requirements



Q: What should come first, the project scope or the project charter? - ANSWER-The project
charter.



Q: What is the purpose of the project charter? - ANSWER-The project charter normally
approves the project and authorizes it to begin.



Q: What is the lowest level of the WBS? - ANSWER-The work package.




2

,Page 3 of 131




Q: These help you determine whether the project is progressing as planned. - ANSWER-Key
performance indicators (KPI's)



Q: Before assembling the project team, what needs must the project manager assess first? -
ANSWER-Skills required by team members.



Q: Name the two significant processes you'll perform within the human-resources planning
process. - ANSWER-Organizational planning and staff acquisition



Q: This process is where you'll choose team members or organizations who will work on the
project. - ANSWER-Staff acquisition.



Q: What are the triple constraints according to CompTIA? - ANSWER-Time, cost and quality



Q: Name the major elements of a scope document. - ANSWER-product description, key
deliverables, success and acceptance criteria, key performance indicators, exclusions,
assumptions, and constraints.



Q: Performing this function on key deliverables results in the WBS. - ANSWER-Decomposition



Q: An activity that cannot start until its predecessor has concluded is said to have what type of
logical relationship? - ANSWER-Finish-to-start



Q: Name the estimating technique that bases estimates on past projects of similar size and
scope. - ANSWER-Analogous estimating.



Q: What is the first step in examining a scope deviation request? - ANSWER-Identify the cause.

3

, Page 4 of 131




Q: What is the most often used logical relationship? - ANSWER-Finish-to-start



Q: Three point estimates use which three estimates to calculate the average estimate? -
ANSWER-Most likely, pessimistic, and optimistic



Q: Placing activities into a logical sequence and determining their dependencies is called what?
- ANSWER-Activity sequencing



Q: Describe float. - ANSWER-The difference in the length of time between the early start and
late start or the early finish and late finish of an activity on the project.



Q: What type of scheduling chart represents task duration on a timeline and typically displays
dependencies? - ANSWER-Gantt



Q: Name the two types of schedule formats used on most projects. - ANSWER-Gantt charts and
milestone charts.



Q: Name the estimating technique that is a quantitatively based estimating method. - ANSWER-
Parametric estimating.



Q: Gap analysis - ANSWER-Used to document services and functions that have been
accidentally left out, deliberately eliminated, or have yet to be developed.



Q: What chart tracks tasks, resource requirements, and quantity of resources? - ANSWER-
Responsibility assignment matrix (RAM)




4

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper STUVIAGRADES. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €22,11. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 72841 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€22,11
  • (0)
  Kopen