100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
NCIDQ|National Council for Interior Design Qualification| Tests Bundle Set €44,79   In winkelwagen

Voordeelbundel

NCIDQ|National Council for Interior Design Qualification| Tests Bundle Set

NCIDQ|National Council for Interior Design Qualification| Tests Bundle Set

22 items

NCIDQ Practice Exam Questions – IDFX with correct answers

(0)
€10,70

Your client would like to relocate from an existing ground floor location to several floors in a new building. You have been hired to evaluate the feasibility of the move. Which action should you take FIRST? A. Interview several employees from each division of the company B. Determine the usable f...

Bekijk voorbeeld

NCIDQ Practice Exam Questions – IDPX questions with correct answers

(0)
€7,78

Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished. D. The city inspector ...

Bekijk voorbeeld

NCIDQ IDFX ADA Requirements questions with correct answers

(0)
€7,78

wheelchair clear floor space and turning radius(feet/inches measurement) - correct answer -30" x 48" -60" to make 180 degree turn ADA doorway width - correct answer 32" minimum opening width at 90 degrees ADA toilet requirements - correct answer -grab bars mounted at 33-36" above floor ...

Bekijk voorbeeld

NCIDQ - IDFX Practice Questions with correct answers

(0)
€14,11

Occupancy group Answer The minimum number of toilet fixtures for an interior design is determined by occupant load and? Exit enclosures Answer Where are flame spread ratings in a building the MOST restrictive 1 hour Answer Exit access corridors in non-sprinklered buildings must have a rating o...

Bekijk voorbeeld

NCIDQ IDFX questions with correct answers

(1)
€16,06

Advantages of Gypsum Drywall Answer low install cost, quick & easy installation, fire resistance, sound control capability, easy availability, versatility, ease of finishing & decorating, ease of installation of doors/other openings Gypsum Drywall Edges Answer Tapered: Most common; tapered on fac...

Bekijk voorbeeld

NCIDQ Exam questions with correct answers

(0)
€14,60

In addition to analyzing space needs, the requirements for a client's work flow or business process should be compared with the available space. Which workflow type does not have strict organized method of work flow? a. departmental b. cooperative c. network d. linear Answer c. network With...

Bekijk voorbeeld

NCIDQ Practice Exam Questions – IDFX questions with correct answers

(0)
€13,62

Your client would like to relocate from an existing ground floor location to several floors in a new building. You have been hired to evaluate the feasibility of the move. Which action should you take FIRST? A. Interview several employees from each division of the company B. Determine the usable f...

Bekijk voorbeeld

NCIDQ Practice Test Questions with correct answers

(0)
€14,11

The initial determination of the area required for a client's program gives the Answer Net area Interior spaces often need to be multifunctional or flexible. What are the three components of flexibility as a programmatic design concept? Answer convertibility, expandability, and versatility Wh...

Bekijk voorbeeld

NCIDQ questions with correct answers

(0)
€15,09

Transmission from room A to room B (pic) Answer The construction assembly shown would be best for controlling which of the following kinds of acoustic situations? A heavy-duty, silent door closer Answer To detail a doorframe for a conference room where privacy is critical, which of the following ...

Bekijk voorbeeld

NCIDQ questions with correct answers

(0)
€14,60

Life Cycle Cost Answer The cost of the project, including the combined cost of • Construction • Operation • Maintenance of the project throughout its life cycle Project Cost Answer Significantly affected by the project extent, and includes Cost of preliminary studies • Site cost ...

Bekijk voorbeeld

NCIDQ questions with correct answers

(0)
€15,09

Minimum clear door way - 32" Maximum size of egress door leaf - 48" Answer Minimum clear door way? Maximum size of egress door leaf? NPFA 701 Answer Flammability Standards/Vertical ignition Test What test/standard is used to test draperies and window treatment? NFPA 260 = CAL TB 117 AS...

Bekijk voorbeeld

NCIDQ (IDFX/IDPX) questions with correct answers

(0)
€15,09

4 programming considerations Answer Form, Function, Economy, Time 5 step programming process Answer 1. Goals (what does the client want to achieve and why?) 2. Collect/analyze facts (what do we know? what is a given?) 3. Uncover and test concepts (how does client want to achieve goals?) 4. Det...

Bekijk voorbeeld

NCIDQ IDFX questions with correct answers

(0)
€16,55

The principal consideration in acoustic control in large spaces is the sound absorptive quality of the ________. Answer Ceiling [Noise reduction within a space: In larger rooms, ceiling treatment is most effective, while in smaller rooms, wall treatment is more effective.] These are part of the...

Bekijk voorbeeld

NCIDQ IDFX questions with correct answers

(0)
€14,60

Evaluate the materials with two light sources of different spectral character Answer What method would the designer use to evaluate materials and finishes for a project without knowledge of the building standard lighting temperature? Envelope Answer Which term refers to the entire enclosed area o...

Bekijk voorbeeld

NCIDQ Practice Exam Questions – IDPX questions with correct answers

(0)
€14,11

Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished. D. The city inspector ...

Bekijk voorbeeld

NCIDQ – Practicum questions with correct answers

(0)
€14,11

In wet areas, what are the requirements for wall finishes? Answer - walls within 2' or service sinks, toilets, or urinals are required to be constructed of moisture resistant material (cement board, X) and are required to have tile (or similar) finish up to minimum 4' AFF. Wallcovering may be used...

Bekijk voorbeeld

NCIDQ - Questions to Review with correct answers

(0)
€13,14

Which of the following is not true about layering? Answer allows for multiple consultants to collaborate on the drawing set Interior dimension strings should... Answer Have a dimension missing What would be the BEST scale to use to show a detail of a reveal for a full height millwork cabinet, ...

Bekijk voorbeeld

NCIDQ IDFX – Codes questions with correct answers

(0)
€12,65

ASTM E648 Answer Testing of flame spread of flooring ASHRAE 90.1 Answer Standard for Energy efficiency of buildings CAL TB 133 Answer Full Seating Test - Actual sample of chair tested on flame ASTM 119 Answer FIRE TESTS FOR CONSTRUCTION ASSEMBLIES Fire tests of building construction and mat...

Bekijk voorbeeld

NCIDQ IDFC EXAM questions with correct answers

(0)
€14,11

In which case would the number of people occupying a space NOT be critical to the programming effort? Answer the workroom of a commercial laundry In surveying existing conditions of an older building before beginning space planning, an interior designer would probably need to seek expert consulti...

Bekijk voorbeeld

NCIDQ - IDFX - Practice test 1 questions with correct answers

(0)
€14,11

At what stage would a building analysis be conducted for an existing multi-story structure that is being renovated and converted from office use to school use? a. schematics b. master planning c. code analysis d. programming Answer programming which of the following is the MOST important conside...

Bekijk voorbeeld

NCIDQ - IDFX - Practice test 1 questions with correct answers

(0)
€13,62

What is a Title and Index Sheet and what does it include? Answer The first sheet of a set of construction documents for large projects; may contain an index to drawing set, light of abbreviations and symbols, project data required by building department, and general notes. What sheets are include...

Bekijk voorbeeld

NCIDQ Review - Construction questions with correct answers

(0)
€12,16

NCIDQ Review - Construction questions with correct answers

Bekijk voorbeeld
Alles Zien
avatar-seller

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper cracker. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €44,79. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 62491 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


€297,79 €44,79  1x  verkocht
  • (0)
  Kopen