, Project Risk Management.
• Every project is risky, meaning project outcomes would
not turn out as planned.
• The project could significantly overrun cost or schedule
targets; the end-item may fall short of requirements.
• Project outcomes result from many things, including
some that are rather unpredictable and over which
project managers have little control.
• Risk level is associated with the certainty that outcomes
will be as expected.
• High-certainty outcomes have low risk; low-certainty
outcomes have high risk.
• Certainty derives from knowledge and experience
gained in prior projects as well as management’s ability
to mitigate anticipated risks and respond to emerging
problems.
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper tatendamuzavazi. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €5,41. Je zit daarna nergens aan vast.