U3 ICC Tank Tightness Testing Exam Questions and Answers (Latest Update 2023) Verified Answers On a steel tank without cathodic protection, if a coating is flawed, what happens at the flaw?
a. Cathodic surface is increased
b. Current flow is increased from this area
c. Current flow is increased to this area - correct answers ✅b. Current flow is increased from this area
On an impressed current cathodic protection system, the negative wire of the rectifier is connected to the:
a. Anode
b. Cathode
c. Drop tube
d. Dielectric union - correct answers ✅b. Cathode
All are examples of acceptable release detection for tanks, except:
a. Impressed current cathodic protection
b. Automatic tank gauging
c. Statistical inventory reconciliation U3 ICC Tank Tightness Testing Exam Questions and Answers (Latest Update 2023) Verified Answers d. Soil-vapor monitoring - correct answers ✅a. Impressed current cathodic protection
When a tank is temporarily closed, the cathodic protection system:
a. Must be turned off
b. Must remain in operation
c. Should be removed
d. Operator can have it on or off. - correct answers ✅b. Must remain in operation
When a steel tank is installed with a galvanic CP system attached, the tank gauges are usually connected through a riser with a dielectric bushing. What is the purpose of that?
a. To prevent static discharge
b. To minimize effects of noise
c. To electrically isolate the tank from the tank gauge
d. To prevent water intrusion in the tank - correct answers ✅c. To electrically isolate the tank from the tank gauge U3 ICC Tank Tightness Testing Exam Questions and Answers (Latest Update 2023) Verified Answers Factory-installed diectric coatings may include all of the following except:
a . Asphalt
b. epoxies
c. Enamels
d. fiberglass-reinforced plastic - correct answers ✅a . Asphalt
According to the EPA, Tank tightness test data must be maintained for:
a. 18 months
b. 3 years
c. 5 years
d. Until the next test is performed - correct answers ✅d. Until the next test is performed
How long must records of UST system repairs be available on site?
a. 60 days
b. 1 year
c. 5 years
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Allivia. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €14,60. Je zit daarna nergens aan vast.