100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PRO4801 ASSIGNMENT 6 2023 (QUESTIONS & ANSWERS FOR PROJECT MANAGEMENT ASSIGNMENT 6 2023) €7,15   In winkelwagen

Tentamen (uitwerkingen)

PRO4801 ASSIGNMENT 6 2023 (QUESTIONS & ANSWERS FOR PROJECT MANAGEMENT ASSIGNMENT 6 2023)

 177 keer bekeken  8 keer verkocht
  • Vak
  • Instelling
  • Boek

PRO4801 ASSIGNMENT 6 2023 (QUESTIONS & ANSWERS FOR PROJECT MANAGEMENT ASSIGNMENT 6 2023)

Voorbeeld 3 van de 19  pagina's

  • 7 augustus 2023
  • 19
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
0717513144 PRO4801 ASSESSMENT 6 2023 muzavazi47@gmail.com




DISCLAIMER

The PRO4801 assignment 6 2023 is a guide that help students to answer their
6th assessment. Therefore, students can use as the document contains different
pools of questions. Those who need further assistance may contact the given
details:

CONTACT NUMBER:

071 751 3144

EMAIL

muzavazi47@gmail.com




PRO4801 ASSIGNMENT 6 2023 0717513144

,0717513144 PRO4801 ASSESSMENT 6 2023 muzavazi47@gmail.com


Table of Contents
Question 6.1 ............................................................................................................... 4

Project Charter ........................................................................................................ 4

Project Scope Statement ........................................................................................ 5

Work Breakdown Structure (WBS) .......................................................................... 5

Project Plan............................................................................................................. 5

Resource Planning .................................................................................................. 6

Risk Management Plan ........................................................................................... 6

Six key planning steps and how a work breakdown structure (WBS) can improve
project planning: .................................................................................................. 7

Define project goals and scope ............................................................................... 7

Define deliverables ................................................................................................. 7

Define Tasks ........................................................................................................... 7

Activity Sequencing ................................................................................................. 7

Estimate resources and duration ............................................................................ 8

Develop a project plan ............................................................................................ 8

Question 6.2 ............................................................................................................... 8

(i) project master schedule and project activities (8) ............................................ 8

Project master schedule ......................................................................................... 8

Project activities ...................................................................................................... 9

(ii) task schedules, Gantt charts and milestone schedules (8) ............................. 9

Task schedules ....................................................................................................... 9

Gantt charts ............................................................................................................ 9

Milestone schedules ............................................................................................... 9

(iii) network scheduling (4) ................................................................................... 9

Question 6.3 ............................................................................................................. 10

Question 6.4 ............................................................................................................. 12

PRO4801 ASSIGNMENT 6 2023 0717513144

, 0717513144 PRO4801 ASSESSMENT 6 2023 muzavazi47@gmail.com

(ii) Determine the critical path and project duration. (4) ..................................... 13

(iii) Indicate the key differences between AON and AOA networks. (3) .............. 13

Question 6.5 ............................................................................................................. 14

(i) Identify the enemies of “cost estimating” and budgeting (5) .......................... 14

a) Insufficient data: ............................................................................................. 15

b) Scope creep: .................................................................................................. 15

c) Inexperienced team: ....................................................................................... 15

d) External factors: ............................................................................................. 15

e) Over-optimism: ............................................................................................... 15

f) Inadequate risk management: ........................................................................ 15

g) Poor communication: ...................................................................................... 15

h) Inaccurate work breakdown structure (WBS): ................................................ 15

(ii) If you were starting from scratch, how would you use the Project Cost
Accounting System (PCAS) to keep the project under control? (15) ................. 16

a. Establish a comprehensive WBS: .................................................................. 16

b. Cost Estimation using Historical Data:............................................................ 16

c. Risk Management Integration:........................................................................ 16

d. Regular Cost Tracking: ................................................................................... 17

e. Change Control Process: ............................................................................... 17

f. Accurate Time Tracking: ................................................................................. 17

g. Automated Alerts: ........................................................................................... 17

h. Budget Reconciliation: .................................................................................... 17

i. Stakeholder Collaboration: ............................................................................. 17

j. Lessons Learned Repository: ......................................................................... 17

References ............................................................................................................... 19




PRO4801 ASSIGNMENT 6 2023 0717513144

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper tatendamuzavazi. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,15. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 60281 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,15  8x  verkocht
  • (0)
  Kopen