Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

PSPO 1, PSPO 2 Exam Questions With Correct Answers | Latest Update Graded A+ (VERIFIED)

Beoordeling
-
Verkocht
-
Pagina's
92
Cijfer
A+
Geüpload op
08-08-2023
Geschreven in
2023/2024

How frequently the Product Owner should communicate and re-iterate his product vision to the Scrum Team and the Key Stakeholders? - Answer Early and often How does the Product Owner communicate his marketplace knowledge to the Scrum Team (select three)? - Answer - Product Backlog Refinement - Sprint Reviews - Daily ad hoc interactions True or False: A first Sprint can start before the Product Owner has a complete and exhaustive Product Backlog in place. - Answer True As the Development Team starts work during the Sprint, it realizes it has selected too much work to finish in the Sprint. What should it do? - Answer As soon as possible the Sprint, work with the Product Owner to remove some work or Product Backlog items The Product Owner makes sure the team selects enough from the Product Backlog for a Sprint to Satisfy the stakeholders - Answer false When is the sprint backlog created? - Answer During the Sprint Planning meeting Which statement best describes Scrum? - Answer A framework within which complex products in complex enviornments are developed The product owner must release each Increment to production - Answer when it makes sense The product owner should have a complete and exhaustive product backlog before the first sprint can start? - Answer False Upon what kind of process control is SCRUM based? - Answer Empirical If burndown charts are used to visualize progress, what do they track? - Answer Work remaining across time An organization has decided to adopt SCRUM, but management wants to change the terminology to fit with terminology already used. What will likely happen if it is done? - Answer All Answers Apply -Without a new vocabulary as a reminder of change, very little change may actually happen -Management may feel less anxious -The Organization may not understand what had changed within Scrum and the benefits of Scrum may be lost 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ Who determines how work is performed during the sprint? - Answer The development Team A scrum master is introducing scrum a new development team. The development team has decided that a retrospective is unnecessary. What action should the Scrum Master take? - Answer Being facilitating productive and useful retrospectives The definitions of "Done" is used to: (Choose three answers) - Answer -Create a shared understanding of when work is complete -Describe the work that must be done before the sprint is hallowed to end -increase transparency Choose three responsibilities of a self-organizing Development Team. Choose Three Answers - Answer -DO the work planned in the Sprint Backlog -increase Velocity -Pull proudct backlog items for the Sprint A Scrum Master is keeping a list of open impediments, but it is growing and he/she has been able to resolve only a small portion of the impediments. Which three techniques would be most helpful in this situation? Choose 3 answers - Answer - Prioritize the list and work on them in order -Alert management to the impediments and their impact -consult with the development team Sprint burndown charts are an efficient tracking tool because they show: - Answer An estimate of the total work remaining for the Sprint When is a Product Backlog item considered complete? - Answer When all work in the Sprint Backlog related to the item is finished The product backlog is ordered by - Answer Higher priority items are at the top Scrum is a methodology that tells in detail how to build software incrementally? - Answer False The Scrum Master observes the Product Owner struggling with ordering the Product Backlog. What would you consider an appropriate action for Scrum Master to take? - Answer Offer the Product Owner help in ordering the Product Backlog from an understanding that the goal is to maximize value Who owns the Sprint Backlog? - Answer The Development Team When a Development Team is having trouble delivering a working Increment because they don't understand a functional requirement, what should they do? - Answer Collaborate with the Product Owner to determine what is possible and acceptable 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ Who creates a Product Backlog item's estimate? - Answer The Development Team after clarifying requirements with the Product Owner. What are two responsibilities of testers in a Development Team? Choose two answers - Answer -Scrum has no "tester Role" -Everyone in the Development Team is responsible for quality When do Development Team members take ownership of a Sprint Backlog item? - Answer Never all Sprint Backlog items are owned by the entire Development Team, even though each one way be done by an individual Development Team Member Which of the following best describes an increment of working software? - Answer Additional features in a useable state that complement those delivered in previous Iterations Which statement best describes the Sprint Backlog as outcome of the Sprint Planning? - Answer It is a complete list of all work to be done in a Sprint Which three of the following are true about Scrum? - Answer -Scrum is a framework for developing and maintaining complex products -Scrum is based on empirical process control theory -Each component of Scrum serves a specific purpose and is essential to Scrum's and your usage of Scrum to develop complex products A new developer is having continuing conflicts with existing Development Team members and creating a hostile environment. If necessary, responsible for removing the team member? - Answer The Scrum Master is responsible, because he/she removes impediments How much work must a Development Team do to a Product Backlog item it selects for a Sprint? - Answer As much as it has told the Product Owner will be done for every Product Backlog item it selects in conformance with the definition of "Done" If burndown charts are used to visualize progress, what does a trend line through a release burndown chart indicate? - Answer When the work remaining will be likely completed if nothing changes on the Product Backlog or the Development Team Who should know the most about the progress toward a business objective or a release? - Answer The Product Owner During a Sprint, when is new work or further decomposition of work added to the Sprint Backlog? - Answer As soon as possible after they are identified 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ A scrum master is introducing Scrum a new Development Team. The Development Team has decided that a retrospective is unnecessary. What action should the Scrum Master take? - Answer Being facilitating productive and useful retrospective How much of the Backlog must be defined during the Sprint Planning meeting - Answer Enough so the Development Team can create its best forecast of what it can do, and to start several days of the Sprint Which two of the following are true about the Scrum Master Role? (Choose two answers) - Answer -The Scrum Master teaches the development team to keep the scrum meetings to their timebox -The Scrum Master helps those outside the team interact with the Scrum Team Which are properties of the Daily Scrum? (Choose two answers) - Answer -It is fifteen minutes or less in duration -Its location and time should remain constant For which is the Scrum Master responsible? - Answer The Scrum process being adopted and used properly. A product increment must be released to production at the end of each Sprint - Answer False Choose three responsibilities of a self-organizing Development Team - Answer -do the work planned in the sprint backlog -increase velocity -pull product backlog items for the sprint When many Scrum teams are working on the same product, should all their increments be integrated every Sprint? - Answer Yes, but only for Scrum Teams whose work has dependencies Who determines how work is performed during the Sprint? - Answer The development Team How much time is required after a Sprint to prepare for the next sprint? - Answer None. A new sprint starts immediately following the end of the previous Sprint Who should make sure everyone on the Development Team does his or her tasks for the Sprint? - Answer The Development Team Why does a Development Team need a Sprint Goal - Answer A Sprint Goal ensures that all of the Product Backlog items selected for the Sprint are implemented. A Scrum Master is keeping a list of open impediments, but it is growing and he/she has been able to resolve only a small portion of the impediments. Which three 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ techniques would be most helpful in this situation? Choose three answers - Answer - Prioritize the list and work on them in order -Alert management to the impediments and their impact -Consult with the Development Team When is a Sprint cancelled? - Answer When the Product Owner determines that it makes no sense to finish it. What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity? - Answer By facilitating Development Team decisions and removing impediments During the Daily Scrum, the Scrum Master's role is to: - Answer Teach the Development Team to keep the Daily Scrum within the 15 minute timebox Which two things are appropriate for a Scrum Master to do if the Development Team doesn't have the engineering tools and infrastructure to completely finish each selected Product Backlog item? - Answer -Have the Development Team establish a Definition of Done that is actually possible to achieve given current circumstances -Coach the Development Team to improve its skills, tools, and infrastructure over time and adjust the Definition of Done accordingly When may a Development Team change its engineering practices? - Answer Whenever needed What are the three benefits of self-organization? - Answer -increased accountability -Increased commitment -Increased creativity Which three questions are answered by all Development Team members at Daily Scrum? - Answer -What work did I do yesterday to help the team achieve its goal? -What work am I going to do today to help the team achieve its goal -What impediments are in the way of the team Which of the following are true about the Product Owner role? Choose three answers - Answer -The Product Owner is one person -The Product Owner is accountable for ordering the Product Backlog -The Product Owner can be influenced by a committee The timebox for a Daily Scrum is - Answer 15 minutes Which is NOT a Development Team responsibility? - Answer Selecting the Product Owner 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ What happens if the Development Team cannot complete its work by the end of the Sprint? - Answer The Sprint length holds and the Development Team continuously learns what is actually possible to do within a Sprint of this length A Scrum Master is working with a Development Team that has members in different physical locations. The Development Team meets in a variety of meeting rooms and has much to do logistically (for example, set up conference calls) before the Daily Scrum. What action should the Scrum Master take? - Answer Set up the meeting and tell the Development Team that is how it will be done When does the next Sprint Planning? - Answer Immediately after the conclusion of the previous Sprint The Product Owner makes sure the team selects enough from the Product Backlog for a Sprint to satisfy the stakeholders - Answer False What is the purpose of a Sprint Review? - Answer To inspect the product increment with stakeholders and collect feedback on next steps What does it mean for a Development Team to be cross-functional? - Answer The development team includes cross-skilled individuals who are able to contribute to do what is necessary to deliver an increment of software. What is a time-box for the Sprint Review - Answer 4 hours of a monthly Sprint Which technique is the least productive way the Scrum Master can ensure that the Development Team communicates effectively with the Product Owner? - Answer Act as a go-between for them Which of the following might the Scrum Team discuss during a Sprint Retrospective? - Answer All of the Above (The way the Scrum Team does Sprint Planning, Skills needed to improve the Development Teams's ability to deliver, methods of communications, it's definition of done" Which of the following are roles on Scrum Team? - Answer -Development Team -Scrum Master -Product Owner Which two things should the Development Team do during the first Sprint? Choose 2 answers - Answer -Create an increment of potentially releasable software -Develop at least one piece of functionality Which two activities will a product Owner engage in during a Sprint? Choose 2 answers - Answer -Work with the stakeholder -Answer questions from the Development Team about items in the current Sprint 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ What does it mean to say that an event has a time-box? - Answer The event can take no more than a maximum amount of time What are two responsibilities of testers in a Development Team? - Answer -Scrum has no "tester" role -Everyone in the Development Team is responsible for quality How often should Development Team membership change? - Answer As needed, while taking into account a short term reduction in productivity A Scrum Team is only allowed to meet with the stakeholders during Sprint Review. - Answer False The purpose of a Sprint is to produce a done increment of Product - Answer True Who is responsible for engaging the stakeholders? - Answer The Product Owner When can a Development Team cancel a Sprint - Answer It can't. Only Product Owners can cancel Sprints. Who must do all the work to make sure Product Backlog items conform to the Definition of "Done"? - Answer The Product Owner Multiple Scrum Teams working on the same project must have the same Sprint start date. - Answer False The Product Owner must release each increment to production - Answer When it makes sense What is the time-box the Sprint Planning meeting? - Answer 8 Hours for a monthly Sprint What is the maximum length of a Sprint? - Answer All of these answers are correct (No more than one calendar month, Not so long that the risk is unacceptable to the Product Owner, Not so long that other business event can't be readily synchronized with the development work When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint? - Answer Yes, but only for Scrum Teams whose work has dependencies Which three of the following are feedback loops inScrum? - Answer -Daily Scrum -Sprint Retrospective -Sprint Review 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ Which outcome is expected as Scrum Teams mature? - Answer They will improve their definition of "Done" to include more stringent criteria. When multiple teams are working together, each team should maintain a separate Product Backlog - Answer False Which are NOT appropriate topics for discussion in a Sprint Retrospective? (Choose two answers) - Answer -Sprint Backlog for the next Sprint -The value of work currently in the Product Backlog Why does a Development Team need a Sprint Goal? - Answer The Development Team is more focused with a common yet specific goal When is a Sprint over? - Answer When the time box expires When may a Development Team change its engineering practices - Answer whenever needed A Scrum Team is only allowed to meet with stakeholders during the Sprint Review? - Answer False Which of the following is not a time-box in Scrum? - Answer - Release Testing - Sprint 0 - Release Retrospective - Sprint Testing What is the best definition of "Done"? - Answer The definition of done is used to assess when work is complete on the product Increment. We know that customer satisfaction is an important success factor. How often should it be measured? - Answer Frequently The sprint had already begun when the customer decides to add a new features that she wants. The Product Owner could: - Answer Introduce the new feature in the next Sprint Planning Who or what limites the authority of the Product Owner? - Answer Nothing Scrum determines that there is only one product owner per product. Why is it important? - Answer The development team will know who is responsible for prioritizing the backlog What are the two essential features a Scrum Team should possess? - Answer -It should choose how best to accomplish their work, rather than being directed by others outside the team 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ -It should have all competencies needed to accomplish the work without depending on others not part of the team A system is decomposed into elements like workflows, features, capabilities, etc. How it affects Scrum Teams on a scaled project? - Answer It will be reflected in the implementation. Two ways how Dev Teams can ensure a good application architecture? - Answer * Architecture is an ongoing discussion * The DT should have a set of architecture principles and follow them How to start a big complex project? - Answer Form 1-2 teams of best developers for implementing the core, add more teams later. During sprint review stakeholders notice that the product development progress is not very clearly visible and lacked transparency. Moreover, they are not able to understand the next steps. Who is responsible for this? - Answer Product Owner is responsible Scrum Team decides they need to create one more artifact UI markup to better understand the product feature, can they proceed or not since Scrum Teams should capture product features/needs only in Product Backlog? - Answer Of course, the team can proceed. Right, PB is the single source of requirements for any changes to be made to the product. If the Scrum Team does not understand what should be done next, it means the PB needs to be refined. The Product Owner should put his product vision as backlog items, maybe with help of the Development Team. Does the Product Backlog contain only functional requirements for the Product? - Answer No A Project Manager working with your Scrum Team has raised concerns about progress and money spent. What are the two best responses? - Answer 1) Scrum doesn't have PMs* 2) Share the PB and forecast for the sprint* Who are the individuals the PO should consult with when considering the value of a Product? - Answer The most important individuals for maximizing value for the Product are the Key Stakeholders. The PO should identify and involve them as necessary throughout the development effort. The Key Stakeholders are typically customers, purchasers, users, and the people that fund the product's development. These people may be internal or external to the Organization. What is Product Owner work that a Product Owner might delegate? Choose one from (a. Ordering PB, b. Writing user stories, c. Facilitating meetings). - Answer The Product Owner can delegate ordering the product backlog 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ What three things might a Scrum Product Owner focus on to ensure his product delivers value? - Answer -Key Stakeholder Involvement -Product Marketplace -Product Release Decisions My job as a Product Owner focuses on the following (Choose 2 answers): - Answer - Clearly communicating project or release status and strategies to customers and stakeholders -Working with customers and stakeholders to identify the most important product requirements All work to be done by the Development Team must ultimately originate from the Product Backlog? - Answer I think, in the broad sense the answer is "yes". The PB is the source for the Sprint Backlog. The Sprint Backlog is the source of the Dev Team work. However, only the Dev Team knows how to implement Sprint Backlog Items. It can involve technical tasks, for example, removing some technical debt or even installing a development environment for a new developer. A Product Owner can measure success by an increase in the team's velocity? - Answer No. It is just one of the first steps to success. Success in Scrum is getting maximum value with the existing resources. Value, as defined in a Scrum context, is the financial (or social) benefit an organization receives or might receive by creating and releasing the product under development. In order for value to actually be captured, a release of the product must occur. The sooner you release, the sooner you can start capturing the value created by the product.Increase in team's velocity shows that the Dev Team became more mature and can do more in the same time frame The Sprint Review is mainly an inspect and adapt opportunity for which group? - Answer The Scrum Team and Stakeholders If two Scrum Teams are added to the development of a product that previously only had one Scrum Team, what will be the immediate impact on productivity of the original Scrum Team? - Answer Its productivity is likely to decrease What three factors are best considered when establishing the sprint length? Choose 3 answers. - Answer -is good because the bigger part of interaction with the Key Stakeholders happens at the Sprint Review meeting. If the Sprint length is bigger, this feedback loop becomes longer. -Shorter Sprints is an effective way to hone in on the requirements or try out the technology before committing to a solution. -Shorter Sprints suppose that the Dev Team produces "done" increments more frequently. It allows the PO to release the increments more frequently too. How would an organization with 100 developers divide into teams? - Answer - Developers will form teams themselves. 2022 PSPO 1, PSPO 2 Exam(Answered)Download To Score A+ -Understanding scrum encourage self organization, developers will organize themselves into teams based on skills -Product owner brings all developer working on same product together for planning and depending on functionalities , developer with self organize themselves into teams. The Sprint Goal is the result of the Sprint Planning, just as the Sprint backlog. - Answer True Which topics should be discussed in the Sprint Review? - Answer Sprint Results In which meetings the Key Stakeholders are allowed to participate? - Answer The Sprint Review In which cases an Increment is valuable? (choose 2 answers - Answer -It reduces long-term operational costs -It increases customer satisfaction

Meer zien Lees minder
Instelling
PSPO I
Vak
PSPO I











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
PSPO I
Vak
PSPO I

Documentinformatie

Geüpload op
8 augustus 2023
Aantal pagina's
92
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€21,99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STUDYROOM2026 Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
409
Lid sinds
2 jaar
Aantal volgers
212
Documenten
3904
Laatst verkocht
1 week geleden

For all Nursing Test Banks visit my page. All Papers are Verified and Graded to Score A++ Wish you Success.

3,6

63 beoordelingen

5
22
4
14
3
14
2
4
1
9

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen