100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
2023/2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 300 QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES| AGRADE| MOST RECENT €25,53
In winkelwagen

Tentamen (uitwerkingen)

2023/2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 300 QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES| AGRADE| MOST RECENT

1 beoordeling
 5 keer verkocht
  • Vak
  • FLORIDA CONTRACTOR\'S MANUAL
  • Instelling
  • FLORIDA CONTRACTOR\'S MANUAL

2023/2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 300 QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES| AGRADE| MOST RECENT

Voorbeeld 4 van de 118  pagina's

  • 9 augustus 2023
  • 118
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • FLORIDA CONTRACTOR'S MANUAL
  • FLORIDA CONTRACTOR'S MANUAL

1  beoordeling

review-writer-avatar

Door: mzvm62 • 5 maanden geleden

avatar-seller
2023/2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 300 QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES | AGRADE| MOST RECENT A Subcontractor's employee incorrectly performs the Work. Who is responsible (to the Owner) for the error? 1- Subcontractor employee 2- Architect 3- Subcontractor 4- Contractor -ANSWER -A201: 3.3.2 Article 3) Contractor 3.3 Supervision and Construction Procedures 4- Contractor Which of the following is NOT a cause for the Owner to terminate the Contract? 1- The Contractor experiences delays due to a Stop Work order through an act of government 2- The Contractor fails to make payment to Subcontractors for labor 3- The Contractor is guilty of substantial breach of a provision of the Contract Documents 4- The Co ntractor repeatedly fails to supply enough properly skilled workers -
ANSWER -A201: 14.2.1 Article 14) Termination or Suspension of the Contract 14.2 Termination by the Owner for Cause 1- The Contractor experiences delays due to a Stop Work order through an act of government Which of the following is owner of all drawings and specifications? 1- Contractor 2- Owner 3- Architect 4- Supplier -ANSWER -A201: 1.5.1 Article 1) General Provisions 1.5 Ownership and Use of Drawings, Specifications and Other Instruments of Service 3- Architect Except for those Claims excluded by this AIA A201 Section 15,2,1, an initial decision shall be required as a condition precedent to mediation of any Claim arising prior to the date final payment is due, unless 3 0 days have passed after the Claim has been referred to the Initial Decision Maker with no decision having been rendered. 1- 10 2- 20 3- 15 4- 30 -ANSWER -A201: 15.2.1 Article 15) Claims and Disputes 15.2 Initial Decision 4- 30 The ____________ will on request furnish to a ____________ information regarding percentages of completion or amounts applied for by the Contractor 1- Subcontractor; Owner 2- Architect; Subcontractor 3- Owner; Subcontractor 4- Owner; Architect -ANSWER -A201: 9.6.3 Articl e 9) Payments and Completiong 9.6 Progress Payments 2- Architect; Subcontractor To whom is the Subcontractor bound to by the Contract Documents? 1- Architect 2- Owner 3- Themselves 4- Contractor -ANSWER -A201: 5.3 Article 5) Subcontractors 5.3 Subco ntractual Relations 4- Contractor The Initial Decision Maker will review claims within 10 days of the receipt of the Claim take one or more of the following actions. Which of the following actions will NOT be taken? 1- Approve the Claim 2- Request additional supporting data from the Claimant 3- Reject the Claim 4- Ignore the request -ANSWER -A201: 15.2.2 Article 15) Claims and Disputes 15.2 Initial Decision 4- Ignore the request A Sub -subcontractor is a person or entity who has a direct or i ndirect contract with a/an ________________ to perform a portion of the Work at the site 1- Contractor 2- Subcontractor 3- Architect 4- Supplier -ANSWER -A201: 5.1.2 Article 5) Subcontractors 5.1 Definitions 2- Subcontractor If the Work is stopped for a period of ______ consecutive days through no fault of the Contractor, or Subcontractor, agents, employees or any other persons performing portions of the Work under contract with the Contractor, the Contractor may terminate the Contract and recover f rom the Owner 1- 120 2- 60 3- 30 4- 45 -ANSWER -A201: 14.1.4 Article 14) Termination or Suspension of the Contract 14.1 Termination by the Contractor 2- 60 What is the maximum amount of time after Substantial Completion of the Work shall all clai ms (by Owner and Contractor) regarding the Contract by commenced? 1- Six months

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper muriithikelvin. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €25,53. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 69052 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
€25,53  5x  verkocht
  • (1)
In winkelwagen
Toegevoegd