100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS | ACCURATE AND VERIFIED WITH RATIONALES | UPDATED 2024 | GRADED A | GUARANTEED PASS €20,65   In winkelwagen

Tentamen (uitwerkingen)

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS | ACCURATE AND VERIFIED WITH RATIONALES | UPDATED 2024 | GRADED A | GUARANTEED PASS

5 beoordelingen
 345 keer bekeken  7 keer verkocht
  • Vak
  • Ifmp
  • Instelling
  • Ifmp

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS | ACCURATE AND VERIFIED WITH RATIONALES | UPDATED 2024 | GRADED A | GUARANTEED PASS

Voorbeeld 2 van de 12  pagina's

  • 4 januari 2024
  • 12
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • Ifmp
  • Ifmp

5  beoordelingen

review-writer-avatar

Door: tiburke424 • 3 maanden geleden

There were no questions on the test

review-writer-avatar

Door: tedbarroca • 4 maanden geleden

review-writer-avatar

Door: DrReiss • 10 maanden geleden

accurate and very useful resource. very detailed

review-writer-avatar

Door: RegisteredNurse • 10 maanden geleden

VERY ACCURATE. THANKS A LOT

review-writer-avatar

Door: Dredward • 10 maanden geleden

Accurate. I passed well . value for money indeed

avatar-seller
IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS | ACCURATE AND VERIFIED WITH RATIONALES | UPDATED 2024 | GRADED A | GUARANTEED PASS If an organization has narrowed the list of contractors submitting proposals but is still having trouble deciding between them, what could help? - CORRE CT ANSWER The correct answer is: Bidder presentations Which statement is true of the Execute, Monitor and Control phases of the project model? - CORRECT ANSWER The correct answer is: These phases are often concurrently or iteratively performed. Whe n project managers determine the level of data to collect for monitoring and controlling project work, what do they not need to verify? - CORRECT ANSWER The correct answer is: Project work delays due to data collection are scheduled. What do project m anagers submit when they suggest revising the project management plan to make it feasible given the current situation? - CORRECT ANSWER The correct answer is: change order. What is developed to review a final deliverable from an entire system perspect ive? - CORRECT ANSWER The correct answer is: Checklist reviews Which statement is true about the documentation for project closure? - CORRECT ANSWER The correct answer is: Documentation may include operations and maintenance manuals . A project ma nager wants to minimize risk and provide some independent checks and balances on contractor work. Which contract model should the organization use? - CORRECT ANSWER Construction management Your answer is correct. Construction management is the best ch oice because it uses an independent consultant to supervise separate contracts with design firms and construction firms, which allows for some independent review. (Reference: 3 -2-10) According to the critical path method (CPM) of scheduling, what is the critical path for any project? - CORRECT ANSWER the longest set of sequential tasks in the project. Your answer is correct. The critical path is the longest set of sequential tasks in a project and indicates the shortest possible project duration. The critical path is determined using forward pass scheduling followed by backward pass scheduling.(Reference: 3 -2-3) Why does a budget need to be closely integrated with the project sche dule? - CORRECT ANSWER costs are allocated to the period in which they occur. Your answer is correct . Development of the budget requires close integration with the project schedule because costs are allocated to the period in which the costs are incur red. Similarly, budget constraints can require changes to the project schedule such as completing a task more quickly to minimize financing costs. Budgets are produced after schedules. Estimates for costs are made during planning rather than waiting until later.(Reference: 3 -2-5) Which scheduling methods are for activities NOT concurrently performed? - CORRECT ANSWER Traditional waterfall model scheduling Your answer is correct. In forward pass, backward pass, and critical pass scheduling, as many act ivities as possible are concurrently performed, constrained by resource availability and predecessors. The traditional waterfall model does not include these time -saving processes, and therefore it is rarely used for project scheduling.(Reference: 3 -2-3) Which statement is true about the process steps used to build a project schedule? - CORRECT ANSWER Failure to agree on a duration estimate may indicate a need for further task division. Your answer is correct. Failure to come to agreement on an estima te may indicate the task needs to be further broken down. Dependencies are part of sequencing. Knowing the skill levels of personnel affects the length of time required for a task, so determining this is necessary. Sequencing is not performed during work b reakdown structure creation. (Reference: 3 -2-3) Which statement is true of communications management for an office relocation? - CORRECT ANSWER Post -relocation orientation brochures can help employees find their way around. Your answer is correct. Which attribute most accurately describes a project? - CORRECT ANSWER The correct answer is: Projects are finite. What is an example of how project managers apply sound management techniques? - CORRECT ANSWER The correct answer is: they break down a task further if it remains at the same percent completion despite repor ted progress. Which is an advantage of using a standardized project management model? - CORRECT ANSWER The correct answer is: The model is a framework that project managers can adapt to project specifics. In the project model, what do outputs from th e Plan phase become? - CORRECT ANSWER The correct answer is: inputs to the Execute phase.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper DrMedinaReed. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €20,65. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 73918 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€20,65  7x  verkocht
  • (5)
  Kopen