SSM TEST REVIEW ACTUAL QUESTIONS AND ANSWERS 2024 GRADED A+
What is the definition of soil and foundation work? - correct answer-Grading in soil or installing underpinning, Augering in soil or removing sheeting, Excavating and drilling in soil or rock When contractors use light duty two-point adjustable suspended scaffolds in NYC, what - correct answer-¾'' grade #1 unspliced manila rope At what grade must power buggy brakes be capable of being fixed in engagement to hold a full load stationary? - correct answer-25% grade The definition of _____________ is: a horizontal transverse scaffold member (which may be supported by legs or runners) upon which the scaffold platform rests and joins scaffold uprights, posts, poles, and similar members - correct answer-Bearer (putlog) The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to the curb at least 20 feet beyond the building line when construction is_______ - correct answer-greater than 100 feet In structures undergoing demolition, how must the existing sprinkler system be maintained - correct answer-Non-automatic and Siamese hose connections shall be marked by a metal sign reading "Sprinkler Siamese Connection" and by a red-light bulb at night A ramp for a power buggy must be designed to support how many times the maximum intended live load - correct answer-4 The permanent floors of skeleton steel construction shall be installed as soon as possible as steel installation progresses. In no case shall there be more than _________ or equivalent levels or __________, whichever is less, between the erection floor and the uppermost permanent floor. - correct answer-8 stories, 120 feet
Geschreven voor
- Instelling
- SSM
- Vak
- SSM
Documentinformatie
- Geüpload op
- 10 maart 2024
- Aantal pagina's
- 11
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
ssm test review actual questions and answers 2024
Ook beschikbaar in voordeelbundel