NYC high pressure boiler license Exam Questions and Correct Answers 100%
NYC high pressure boiler license Exam Questions and Correct Answers 100% The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? - CORRECT ANSWER-10% How is the main steam pressure gages tested? - CORRECT ANSWER-With an inspectors gage Who is in charge of the code for any plumbing installations? - CORRECT ANSWER-The nyc plumbing code When will anchorage or guides be inspected? - CORRECT ANSWER-Annually How many brass washout plugs does a miniature boiler have? - CORRECT ANSWER-3 brass washout plugs, 1" in size How often is HP piping expansion joints inspected? - CORRECT ANSWER-Weekly How long should a hydronic system be pressure tested for? - CORRECT ANSWER-2 hours at no less than 100 psig How is a gage protected from excessive pressure? - CORRECT ANSWER-Shut off cock Who is authorized to witness a test on a gas piping system? - CORRECT ANSWERPlumbing inspector, architect, licensed PE, master plumber, agency by the DOB How should a remote disconnect be labeled? - CORRECT ANSWER-Remote control for burner When is a fusible plug not needed to be installed on a boiler? - CORRECT ANSWEROver 200 psig When shall a power boiler with a MAWP over 400 be tested? - CORRECT ANSWERPressure tested annually What shall a design plan of a boiler and application contain but not limited to? - CORRECT ANSWER-Size, location, operating pressure + temperature of the pressure vessel and type + specs of PRV Who is responsible for maintaining the copies of the certified welder qualifications report? - CORRECT ANSWER-The welding agency and shall be available to the DOB
Geschreven voor
- Instelling
- NYC
- Vak
- NYC
Documentinformatie
- Geüpload op
- 26 mei 2024
- Aantal pagina's
- 23
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
nyc high pressure boiler license exam questions a
-
the minimum blowdown for a spring loaded safety va
-
what items are exempt from the reporting requireme
-
when a boiler is derated what changes