100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
College aantekeningen

List of useful case studies

Beoordeling
-
Verkocht
-
Pagina's
9
Geüpload op
14-08-2019
Geschreven in
2018/2019

Document that supplements "EIA Exam Revision notes", with multiple case studies explained both UK and international for each topic. "EIA Exam revision notes" is also available which has full notes on the topic! (See info below)! ________________________________________ Revision notes for BSc Environmental Impact Assessment (EIA) module. Specific to the UK, with international case studies. Detailed, with key information, and easy to understand. Notes are a combination of lectures and references from key literature (Glasson and Therivel, 2019; Glasson, 2011). Includes important diagrams, and suggestions for further reading, with sources. Each topic references case studies in supplementary documents. Covers: 1) 5 key EIA stages in the environmental statement 2) Baseline data & significance 3) Alternatives, mitigation, and environmental management plans 4) Law and policy 5) Assessing ecology 6) Assessing cultural heritage 7) Landscape and visual assessment 8) Climate change 9) Coastal energy 10) Strategic EIA and sustainable development 11) Quality in EIA Other documents I've included have essay plans for a range of essay topics (significance, climate change, quality etc.), two full essays, and a full list of case studies. Notes got me a 93%! :)

Meer zien Lees minder
Instelling
Vak








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
14 augustus 2019
Aantal pagina's
9
Geschreven in
2018/2019
Type
College aantekeningen
Docent(en)
Onbekend
Bevat
Alle colleges

Onderwerpen

Voorbeeld van de inhoud

Large developments:
- London Heathrow airport expansion
- Oresund bridge connecting Sweden and Denmark;
o Transboundary effects where member states must consult other states if
their development is likely to have a significant impact (still weak).
- Channel tunnel
- 2012 Olympics

General:
 Heathrow terminal 5.
o The site itself: land take, conservation impacts, hydrology. Locally: road
improvements, employment, noise (local & on flight paths). National: status
of impacted conservation areas, economy: local & national effects.
International- greenhouse emissions, trade benefits, tourism impacts
o Planning process cost £63 million over 14 years, Included a 46 month public
enquiry, Construction costs were £4.2 billion
o Need for development: failure to build would cost the UK £600 million a year
in exports, larger aeroplanes (e.g. airbus 380: 555-seater ‘superjumbos’) need
bigger infrastructure, accommodating modern planes can reduce air and
noise pollution while still increasing passenger numbers
o Construction took 6 years (2002-2008) for phase 1, with a further phase
completed in 2011
o Impacts: Workforce (60 contractors), noise, traffic, dust, security, land take,
hydrology, wider infrastructure (road and rail inks, car parking), radar
disturbance, use of resources, cultural heritage. Economy: jobs, services
o Global impacts: climate change, trade
 Southampton IKEA
o Land take of limited importance- brownfield site in urban area, Four storey
building, 600 seat restaurant, 891 space car park opposite Leisure World
o Impacts on the immediate area construction: noise, dust, odours, traffic,
infrastructure, landscape & heritage. Operation: traffic (15% increase
predicted- junction improvements proposed as mitigation), council requiring
bus links to station, city centre and ferries; landscape and heritage, potential
economic impacts on other local business (John Lewis objected)
o Impacts beyond the immediate area traffic, in operation as far as regional
motorways & interactions with docks operations and events, -economic
benefits (£55m pa turnover predicted, 500 jobs locally) but businesses across
the region may be impacted


Scoping report:
 Brownfield Development (residential). Primetower Properties, Bournemouth
 Scoping involved English Nature, and two wildlife NGOs
 Key issues regarding reptiles on site and offsite impacts on nature reserves were
raised
€4,10
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
romilotcheris
5,0
(1)

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
romilotcheris Wageningen University and Research
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
4
Lid sinds
6 jaar
Aantal volgers
3
Documenten
5
Laatst verkocht
2 jaar geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen