100% Correct Answers | Updated & Verified
Which of the following would be considered a primecontractor? - Correct Answer D. A contractor
with whom the project owner has established a contract.
Which of the following correctly identifies what is included in legitimate labor costs? - Correct
Answer D. Hourly wages, fridge benefit packages, payroll taxes insurance and safety costs, and small
tools and consumables
Which in the following best illustrates the PRIMARY role of a foreman? - Correct Answer B. To
Effectively manage and lead the crew
As a foreman what should ALWAYS be your FIRST priority when planning a job? - Correct Answer D.
Keeping the crew actively engaged in completing their work
As a foreman what should ALWAYS be your FIRST priority when planning of a project? - Correct
Answer B. Developing a job strategy before the job begins
Which of the following describe the purpose of Short Interval Planning or Look ahead planning? -
Correct Answer A. Breaking the job into small manageable pieces
Which of the following is the FIRST thing a foreman must do before beginning to plan a job? - Correct
Answer A. Read all the project-related documents
Which of the following provides the BEST example of prefabrication? - Correct Answer A. To Create a
product in the shop and install it in the field
Which of the following is NOT required on a daily log? - Correct Answer C. The work completed by
the individual crew members
Which of the following is NOT likely to lead to improved material handling? - Correct Answer D. Have
all the materials and equipment delivered at the beginning of the job
Which of the following purchasing procedures is MOST likely to reduce material handling time? -
Correct Answer A. Bag and Tag all materials as appropriate
, What should a foreman do if damage to he/she is discovered AFTER the delivery driver has left the
job site? - Correct Answer C. Notify the Project manager and note the damage on the daily log.
Which of the following location represents the BEST place to store job site materials in a manner that
enhance says productivity? - Correct Answer D. As close to the point of installation as possible
With which of the following costs should a foreman be MOST concerned? - Correct Answer A. Labor
Which of the following is NOT considered a DIRECT job cost? - Correct Answer D. Home office
overhead
An ______ occurs when any condition or document modifies the work as defined in the contract
during the BIDDING process - Correct Answer B. Addendum
Where can the requirements for "Job Close Out" be found? - Correct Answer B. Within the contract
documents.
During the course of a project you have noticed that there is a greater than normal number of
Change orders being submitted. Which of the following is the MOST important step that you need to
take? - Correct Answer C. Maintain an accurate job log in case specific questions are asked about why
the project was completed in ways it was.
A "Log Book" is the most appropriate place to document which of the following? - Correct Answer A.
The events that occurred on the job site each day.
Certain steps are typically followed when starting a job. Among those listed below which of the
following options correctly identifies the order these steps should be completed? - Correct Answer C.
Sketch, Layout, Order Material, Install.
When is the BEST time for a foreman to hold information sharing "Toolbox Safety Talks" - Correct
Answer D. Regularly on a weekly basis to address safety issues and learn about new tools or
materials
The bid documents associated with your project state, "Do not remove or disturb and asbestos
containing material. You have 3 days before a planned outage to remove a 12" insulated gate valve