100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PRM3701 ASSIGNMENT 1 semester 2 2024 You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to find status reports, changes, and the creation of forecasts? a. Identifying b. De ning €2,70   In winkelwagen

Tentamen (uitwerkingen)

PRM3701 ASSIGNMENT 1 semester 2 2024 You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to find status reports, changes, and the creation of forecasts? a. Identifying b. De ning

 19 keer bekeken  0 keer verkocht
  • Vak
  • Instelling
  • Boek

PRM3701 ASSIGNMENT 1 semester 2 2024 You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to find status reports, changes, and the creation of forecasts? a. Identifying b. De ning c. Planning d. Executing e. Closi...

[Meer zien]

Voorbeeld 4 van de 112  pagina's

  • 19 augustus 2024
  • 112
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
BMZ ACADEMY




BMZ ACADEMY




@061 262 1185/068 053 8213



BMZ ACADEMY 061 262 1185/068 053 8213

,8/19/24, 9:55 AM Assessment 1




UNISA  2024  PRM3701-24-S2  Welcome Message  Assessment 1

QUIZ




Question 1

Not yet answered

Marked out of 1.00




You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to
find status reports, changes, and the creation of forecasts?


a. Identifying

b. Defining

c. Planning

d. Executing

e. Closing

Clear my choice




Question 2
Not yet answered

Marked out of 1.00




The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go
ahead. Match the stages below according to their correct explanation.


Defining Major responsibilities are assigned

Planning What will the budget be

Executing The physical product is produced

Closing Post-project review




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21108002&cmid=941679 1/7

,8/19/24, 9:55 AM Assessment 1

Question 3

Not yet answered

Marked out of 1.00




At first glance project managers perform the same functions as other managers. That is they plan, schedule, motivate and
control. Which activity below is an activity that does not fall under the function of a project manager?


a. Managing a temporary activity

b. Overseeing existing operations

c. Managing a nonrepetitive activity

d. Responsible for time, cost and performance trade-offs

e. Work with a group of outsiders, including vendors and suppliers

Clear my choice




Question 4
Not yet answered

Marked out of 1.00




An operational project is one that


a. must be completed.

b. supports an organizations’ long-run mission.

c. can improve organizational performance.

d. is completed to meet regulatory compliance.

e. always is extremely relevant to the strategic vision of the organization.

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21108002&cmid=941679 2/7

, 8/19/24, 9:55 AM Assessment 1

Question 5

Not yet answered

Marked out of 1.00




The process of assessing "what we are" and deciding and implementing "what we intend to be and how we are going to get
there" is ______________.




a. strategic management

b. vision and mission setting

c. reflection and inquiry

d. goal and objective clarity

e. mission assessment

Clear my choice




Question 6
Not yet answered

Marked out of 1.00




The following are responsibilities of the governance team when managing a portfolio system are listed below. Identify which
option below is not a responsibility


a. deciding how organizational resources are allocated among the different types of projects

b. publishing the priority of every project and ensuring the process is open and free of power politics.

c. evaluating the progress of the projects in the portfolio.

d. constant scanning of the external environment to determine if organizational selection criteria need to be changed.

e. communicating which projects are approved.

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21108002&cmid=941679 3/7

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BMZAcademy. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €2,70. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 75759 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€2,70
  • (0)
  Kopen