100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PRM3701 ASSIGNMENT 4 SEMESTER 2 2024 The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go ahead. Match the stages below according to their correct explanation. In practice the t €2,73   In winkelwagen

Tentamen (uitwerkingen)

PRM3701 ASSIGNMENT 4 SEMESTER 2 2024 The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go ahead. Match the stages below according to their correct explanation. In practice the t

 29 keer bekeken  3 keer verkocht
  • Vak
  • Instelling

PRM3701 ASSIGNMENT 4 SEMESTER 2 2024 The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go ahead. Match the stages below according to their correct explanation. In practice the terms of a project and program cause conf...

[Meer zien]

Voorbeeld 4 van de 74  pagina's

  • 5 september 2024
  • 74
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Onbekend
avatar-seller
BMZ ACADEMY




BMZ ACADEMY




@061 262 1185/068 053 8213



BMZ ACADEMY 061 262 1185/068 053 8213

,9/5/24, 10:53 AM Assessment 4




PRM3701-24-S2  Welcome Message  Assessment 4

QUIZ




Question 1

Not yet answered

Marked out of 1.00




The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go
ahead. Match the stages below according to their correct explanation.


Defining Major responsibilities are assigned

Planning What will the budget be

Executing The physical product is produced

Closing Post-project review




Question 2

Not yet answered

Marked out of 1.00




In practice the terms of a project and program cause confusion. Which of the following is a good example of a program?


a. Planting a garden

b. Developing a new residential area that includes six custom homes

c. Developing a new marketing plan

d. Taking notes each class meeting to prepare for the final

e. Planning a wedding

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21867331&cmid=941682 1/11

,9/5/24, 10:53 AM Assessment 4

Question 3

Not yet answered

Marked out of 1.00




Which dimension of project management centers on creating a temporary social system within a larger organizational
environment that combines the talents of a divergent set of professionals working to complete the project?



Select one:
a. Communication

b. Sociocultural

c. Social

d. Technical

e. Scheduling

Clear my choice




Question 4
Not yet answered

Marked out of 1.00




In project life cycle stages, the design team might plan a major commitment of resources in the defining stage, while the
quality team would expect their major effort to increase in the latter stages of the project life cycle. As the number of small
projects increase within an organization's portfolio, what is a challenge an organization faces?


a. Sharing resources

b. Measuring efficiency

c. Managing risk

d. Prioritizing projects

e. All of these are challenges

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21867331&cmid=941682 2/11

, 9/5/24, 10:53 AM Assessment 4

Question 5

Not yet answered

Marked out of 1.00




A list of potential projects, several criteria, weights for those criteria, and criteria scores for those projects are all typically
included on a ___________ matrix.


a. Multiple criteria

b. Project screening

c. Project selection

d. Project elimination

e. Project assessment

Clear my choice




Question 6
Not yet answered

Marked out of 1.00




Jack’s organization has many projects ongoing concurrently. He finds himself starting and stopping work on one task to go
and work on another task, and then return to the work on the original task. Jack is experiencing


a. poor scheduling

b. excess work burden.

c. flexible tasking.

d. multitasking.

e. burnout.

Clear my choice




Question 7
Not yet answered

Marked out of 1.00




The following are responsibilities of the governance team when managing a portfolio system are listed below. Identify which
option below is not a responsibility


a. deciding how organizational resources are allocated among the different types of projects

b. publishing the priority of every project and ensuring the process is open and free of power politics.

c. evaluating the progress of the projects in the portfolio.

d. constant scanning of the external environment to determine if organizational selection criteria need to be changed.

e. communicating which projects are approved.

Clear my choice



https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=21867331&cmid=941682 3/11

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BMZAcademy. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €2,73. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 71498 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


€2,73  3x  verkocht
  • (0)
  Kopen