100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
Eerder door jou gezocht
PRM3701 ASSIGNMENT 4 SEMESTER 2 2024 The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go ahead. Match the stages below according to their correct explanation. In practice the t€2,73
In winkelwagen
PRM3701 ASSIGNMENT 4 SEMESTER 2 2024 The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go ahead. Match the stages below according to their correct explanation. In practice the t
29 keer bekeken 3 keer verkocht
Vak
Project Management (PRM3701)
Instelling
University Of South Africa (Unisa)
PRM3701 ASSIGNMENT 4 SEMESTER 2 2024
The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go ahead. Match the stages below according to their correct explanation.
In practice the terms of a project and program cause conf...
The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go
ahead. Match the stages below according to their correct explanation.
Defining Major responsibilities are assigned
Planning What will the budget be
Executing The physical product is produced
Closing Post-project review
Question 2
Not yet answered
Marked out of 1.00
In practice the terms of a project and program cause confusion. Which of the following is a good example of a program?
a. Planting a garden
b. Developing a new residential area that includes six custom homes
c. Developing a new marketing plan
d. Taking notes each class meeting to prepare for the final
Which dimension of project management centers on creating a temporary social system within a larger organizational
environment that combines the talents of a divergent set of professionals working to complete the project?
Select one:
a. Communication
b. Sociocultural
c. Social
d. Technical
e. Scheduling
Clear my choice
Question 4
Not yet answered
Marked out of 1.00
In project life cycle stages, the design team might plan a major commitment of resources in the defining stage, while the
quality team would expect their major effort to increase in the latter stages of the project life cycle. As the number of small
projects increase within an organization's portfolio, what is a challenge an organization faces?
A list of potential projects, several criteria, weights for those criteria, and criteria scores for those projects are all typically
included on a ___________ matrix.
a. Multiple criteria
b. Project screening
c. Project selection
d. Project elimination
e. Project assessment
Clear my choice
Question 6
Not yet answered
Marked out of 1.00
Jack’s organization has many projects ongoing concurrently. He finds himself starting and stopping work on one task to go
and work on another task, and then return to the work on the original task. Jack is experiencing
a. poor scheduling
b. excess work burden.
c. flexible tasking.
d. multitasking.
e. burnout.
Clear my choice
Question 7
Not yet answered
Marked out of 1.00
The following are responsibilities of the governance team when managing a portfolio system are listed below. Identify which
option below is not a responsibility
a. deciding how organizational resources are allocated among the different types of projects
b. publishing the priority of every project and ensuring the process is open and free of power politics.
c. evaluating the progress of the projects in the portfolio.
d. constant scanning of the external environment to determine if organizational selection criteria need to be changed.
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BMZAcademy. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €2,73. Je zit daarna nergens aan vast.