100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
Eerder door jou gezocht
PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed pro€2,72
In winkelwagen
PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed pro
PRM3701 ASSESSEMENT 5 SEMESTER 2 2024
Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down.
This type of project closure is called
a. normal
b. premature
c. perpetual
d. failed project
e. changed priority
In the ...
Thank malulekenthabisengnm81 for the review, tell us if you need anything more about the assignment or the module or any other modules please get in touch through the provided details
Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down.
This type of project closure is called
a. normal
b. premature
c. perpetual
d. failed project
e. changed priority
Clear my choice
Question 2
Not yet answered
Marked out of 1.00
Which part of the audit report examines in detail the underlying causes of problems, issues, and successes relative to the
project and includes concise, factual review statements of the project?
a. Classi�cation
b. Analysis
c. Recommendations
d. Lessons learned
e. Appendix
Clear my choice
CONTACT BMZ @>0612621185 068053 8213
1 of 6 9/10/2024, 7:16
. In the Snapshot from Practice in your textbook, the results of analyzing the Katrina hurricane resulted in a new evaluation plan
from:
a. The state legislature
b. The governor of Louisiana
c. The city of New Orleans
d. The Red Cross
Clear my choice
Question 4
Not yet answered
Marked out of 1.00
This type of closure occurs when the project may never seem to end. At some point the review group should recommend
methods for bringing �nal closure to this type of project. This is considered ___________ closure.
a. normal
b. premature
c. perpetual
d. changed priority
e. failed project
Clear my choice
Question 5
Not yet answered
Marked out of 1.00
It can be a signi�cant challenge to keep the project team ___________ as the project nears completion.
a. focused
b. working
c. energetic
d. together
e. performing
Clear my choice
CONTACT BMZ @>0612621185 068053 8213
2 of 6 9/10/2024, 7:16
Research consistently points out that project success is strongly affected by the degree to which a project has the support of
top management. The following are ways a project manager can manage upward relationships EXCEPT
a. never ignore the chains of command.
b. prove loyalty
c. pick the optimum time to appeal to top management.
d. consistently follow through on requests.
e. accept profound differences in perspective and become skilled at the art of persuading superiors.
Clear my choice
Question 7
Not yet answered
Marked out of 1.00
The second ring in the network of relationships for project managers includes all of the following except:
a. Other project managers
b. Customers
c. Functional managers
d. Sponsors
Clear my choice
Question 8
Not yet answered
Marked out of 1.00
The difference between project management and project leadership is that project management includes:
a. Recognizing the need to alter direction
b. Aligning people to meet new directions
c. Monitoring results against plans
d. Motivating people to meet new objectives
Clear my choice
CONTACT BMZ @>0612621185 068053 8213
3 of 6 9/10/2024, 7:16
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BMZAcademy. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €2,72. Je zit daarna nergens aan vast.