100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed pro €2,72   In winkelwagen

Tentamen (uitwerkingen)

PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed pro

1 beoordeling
 38 keer bekeken  2 keer verkocht
  • Vak
  • Instelling

PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed project e. changed priority In the ...

[Meer zien]

Voorbeeld 4 van de 75  pagina's

  • 10 september 2024
  • 75
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Onbekend

1  beoordeling

review-writer-avatar

Door: malulekenthabisengnm81 • 2 maanden geleden

reply-writer-avatar

Door: BMZAcademy • 2 maanden geleden

Thank malulekenthabisengnm81 for the review, tell us if you need anything more about the assignment or the module or any other modules please get in touch through the provided details

avatar-seller
BMZ ACADEMY




BMZ ACADEMY




@061 262 1185/068 053 8213



BMZ ACADEMY 061 262 1185/068 053 8213

,Assessment 5 https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22




PRM3701-24-S2  Welcome Message  Assessment 5

QUIZ




Question 1

Not yet answered

Marked out of 1.00




Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down.
This type of project closure is called


a. normal

b. premature

c. perpetual

d. failed project

e. changed priority

Clear my choice




Question 2

Not yet answered

Marked out of 1.00




Which part of the audit report examines in detail the underlying causes of problems, issues, and successes relative to the
project and includes concise, factual review statements of the project?


a. Classi�cation

b. Analysis

c. Recommendations

d. Lessons learned

e. Appendix

Clear my choice




CONTACT BMZ @>0612621185 068053 8213
1 of 6 9/10/2024, 7:16

,Assessment 5 https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22


Question 3

Not yet answered

Marked out of 1.00




. In the Snapshot from Practice in your textbook, the results of analyzing the Katrina hurricane resulted in a new evaluation plan
from:


a. The state legislature

b. The governor of Louisiana




c. The city of New Orleans

d. The Red Cross

Clear my choice




Question 4

Not yet answered

Marked out of 1.00




This type of closure occurs when the project may never seem to end. At some point the review group should recommend
methods for bringing �nal closure to this type of project. This is considered ___________ closure.


a. normal

b. premature

c. perpetual

d. changed priority

e. failed project

Clear my choice




Question 5

Not yet answered

Marked out of 1.00




It can be a signi�cant challenge to keep the project team ___________ as the project nears completion.


a. focused

b. working

c. energetic

d. together

e. performing

Clear my choice




CONTACT BMZ @>0612621185 068053 8213
2 of 6 9/10/2024, 7:16

,Assessment 5 https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22


Question 6

Not yet answered

Marked out of 1.00




Research consistently points out that project success is strongly affected by the degree to which a project has the support of
top management. The following are ways a project manager can manage upward relationships EXCEPT


a. never ignore the chains of command.

b. prove loyalty
c. pick the optimum time to appeal to top management.

d. consistently follow through on requests.

e. accept profound differences in perspective and become skilled at the art of persuading superiors.

Clear my choice




Question 7

Not yet answered

Marked out of 1.00




The second ring in the network of relationships for project managers includes all of the following except:




a. Other project managers

b. Customers

c. Functional managers

d. Sponsors

Clear my choice




Question 8

Not yet answered

Marked out of 1.00




The difference between project management and project leadership is that project management includes:


a. Recognizing the need to alter direction

b. Aligning people to meet new directions

c. Monitoring results against plans




d. Motivating people to meet new objectives

Clear my choice




CONTACT BMZ @>0612621185 068053 8213
3 of 6 9/10/2024, 7:16

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BMZAcademy. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €2,72. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 73918 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€2,72  2x  verkocht
  • (1)
  Kopen