What is especially important when the project manager is working with virtual team leads? - Regulating nonverbal communications to maintain cross-cultural respect - Asking for acknowledgment to ensure that the message was understood as intended - Getting feedback to ensure that the intended message is being received - Using an appropriate level of formality for these horizontal communications - ANSWER Getting feedback to ensure that the intended message is being received What is an enterprise environmental factor (EEF) that could affect whether a project can take advantage of a system to produce automated transcripts of virtual meetings? - Whether meetings are scheduled or impromptu

Meer zien Lees minder
Instelling
PMP
Vak
PMP









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
PMP
Vak
PMP

Documentinformatie

Geüpload op
7 oktober 2024
Aantal pagina's
12
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

PMP Exam Prep - Communications
Management CORRECT 100%

What is especially important when the project manager is working with virtual team leads?

- Regulating nonverbal communications to maintain cross-cultural respect

- Asking for acknowledgment to ensure that the message was understood as intended

- Getting feedback to ensure that the intended message is being received

- Using an appropriate level of formality for these horizontal communications - ANSWER Getting
feedback to ensure that the intended message is being received



What is an enterprise environmental factor (EEF) that could affect whether a project can take advantage
of a system to produce automated transcripts of virtual meetings?

- Whether meetings are scheduled or impromptu

- Required meeting minutes format

- Meeting record keeping policy

- Languages spoken - ANSWER Languages spoken



When a team member responsible for an activity reiterates what needs to be done and there is an
obvious flaw in his or her understanding, what is a likely result if the receiver corrects this error?

- The flaw will be resolved without schedule risk or residual risk.

- The flaw will be resolved without schedule risk, but residual risk remains unless there is another round
of communications.

- Correcting the flaw will impact the schedule and create residual risk.

- Correcting the flaw will impact the schedule, but there will be no residual risk since the
communications were successful. - ANSWER The flaw will be resolved without schedule risk, but residual
risk remains unless there is another round of communications.



What is an example of an enterprise environmental factor (EEF) that might be used as an input to the
Plan Communications Management process?

- Communication methods

, - Communication models

- Communication technology rates

- Lessons learned about communication - ANSWER Communication technology rates



What might prevent a project manager from fully adopting a new conversation thread tracking system to
replace e-mails?

- Unlike e-mail, the system would create too many communication channels.

- IT requires that all project communications be documented and traceable.

- The medium isn't formal enough for certain communications.

- A key stakeholder didn't make it through the training for the system. - ANSWER A key stakeholder didn't
make it through the training for the system.



What is the most important communication dimension for a project manager when handling conflict
resolution with a customer who thought a team lead was rude?

- Horizontal

- Formal

- Official

- External - ANSWER Formal



What is an example of noise in a communication?

- Expert using technical jargon

- Receiver indicating that the message was received without indicating understanding

- Sender having to repeat a message in a different manner

- New video chat technology - ANSWER Expert using technical jargon



A project is complex, and team roles vary considerably. Some team members have complained during
their project performance appraisals that they missed a key metric because the team reports were too
detailed. What can the project manager provide to resolve this situation?

- Dashboards

- Graphics and visual aids to existing reports
€10,14
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Lecchris West Virgina University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
40
Lid sinds
2 jaar
Aantal volgers
15
Documenten
3203
Laatst verkocht
1 maand geleden
LECCHRIS

3,8

6 beoordelingen

5
2
4
1
3
3
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen