100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete €23,13
In winkelwagen

Tentamen (uitwerkingen)

ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete

 0 keer verkocht
  • Vak
  • ACI CONCRETE FIELD
  • Instelling
  • ACI CONCRETE FIELD

ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST GRADED A+ The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AN...

[Meer zien]

Voorbeeld 2 van de 14  pagina's

  • 22 oktober 2024
  • 14
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • ACI CONCRETE FIELD
  • ACI CONCRETE FIELD
avatar-seller
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM AND STUDY
GUIDE 150 QUESTIONS AND CORRECT ANSWERS 2024 LATEST
GRADED A+
The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete. - ANSWER-3 in. [75 mm]



The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANSWER-1 degree F [0.5 C],
30 degrees F to 120 F [0 C to 50 C]



The temperature measuring device shall be calibrated _____, or whenever there is a question of _____.
- ANSWER-Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - ANSWER-True



The temperature of concrete may be measured in a wall form. True of False - ANSWER-True



A composite sample of concrete is required even if the only purpose for obtaining the sample is to
determine temperature. True of False? - ANSWER-False



What must be done to the sample container prior to sampling the concrete? - ANSWER-Dampen (with
water)



What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete. - ANSWER-Gently press the concrete around the temperature
measuring device at the surface of the concrete



How long must the temperature measuring device remain in the freshly mixed concrete? - ANSWER-At
least 2 minutes but not more than 5 minutes



After the temperature of the concrete is read, what is required? - ANSWER-Reporting of temperature

, The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - ANSWER-1 degree F
[0.5 C]



According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWER-Verify
conformance to a specified requirement for temperature of concrete



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
ANSWER-False



The sample of concrete used for temperature determination must be rodded 25 times. True or False? -
ANSWER-False



Sampling by this method is required when tests are to be made to determine _____ with specification
requirements. - ANSWER-Compliance



This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. -
ANSWER-Stationary mixers, paving mixers, revolving drum mixers, and open top mixers



The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes. - ANSWER-15



Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True
of False? - ANSWER-True



The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes. - ANSWER-5



The molding of strength test specimens shall begin within _____ minutes after fabricating the composite
sample. - ANSWER-15



The concrete sample must be protected from contamination and _____. - ANSWER-Rapid evaporation

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper EXAMINER2025. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €23,13. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 65352 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis

Laatst bekeken door jou


€23,13
  • (0)
In winkelwagen
Toegevoegd