100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Samenvatting

ABC Analysis jan 2025 summary notes

Beoordeling
-
Verkocht
-
Pagina's
9
Geüpload op
23-11-2024
Geschreven in
2024/2025

Summary notes for ABC analysis, Cost and Management Accounting, CA Intermediate Course. Helpful for last day revision and recollection of important formulas.

Instelling
CFA (CFA)
Vak
CFA









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
23 november 2024
Aantal pagina's
9
Geschreven in
2024/2025
Type
Samenvatting

Voorbeeld van de inhoud

Activity Based Costing
Step 1: we will identify various activities going on in a organisation

Step 2: We will compute cost for each activities

Step 3: we will identify suitable cost driver for each activity

"Cost drivers are the factors which are responsible for change in activity cost."

Step 4: we shall compute activity rate or cost driver rate.


Total Activity cost
No. of units of cost driver

Step 5: With the help of cost driver we shall note allocate activity cost to cost object.

"Cost objects are the one who are responsible for bearing the cost of activity.” It may be a
product, department, division, etc.”

VARIANCES


Adverse Favourable
Bad for the company Goods for company



MATERIAL COST VARIANCE
Material cost, labour cost & o VOH cost, all 3 are variable cost i.e. product cost.
∴ Before computing variance for these 3 cost, we need to ensure that both std data as well as
actual data are for the same output i.e. actual Output

Example:
Standard 10 kg Revised std: 1000 kg Actual : 1000 kg
kg @ Amt kg @ Amt kg @ Amt
A 6 6 36 600 6 3600 800 8 6400
B 6 5 30 600 5 3000 500 4 2000
12 kg 1200 1300 8400
- 2 kg -200 - 300
10 kg 66 1000 6,600 1000 8400




1

, Material Cost Variance
[Std Total Mat cost - Actual Total Mat. Cost]
6600-8400 = 1800 A



Material Price Variance Material Usage Variance
[Std Price-Actual Price]x Actual [Std units - Act units] x Std. Price
Qty [600 - 800] × 6 = 1200 A
A [6-8] 800 = 1600 A [600 - 500] x 5 = 500F
B[5-4] 500 = 500 F 700A
1100 A



Material Mix Variance Material Yield Variance



[Std mix for Act. input - Actual mix for Act Input] x std Price

[650 - 800] 6 = 900 A
[650 - 500] 5 = 750 F 550A
1300 1300 150A
[1:1] [8:5]

→ Material Yield Variance :
→ Based on mixture

[Std mix in Std input - Std mix in Actual input] x std Price
A (600-650) X 6 = 300 A
B (600-650) X 5 = 250 A
550A
OR

→ Based on output
[Std output For actual input - Actual output for actual input] x Std avg cost per output
[1083.33-1000] x 6600
1000
1200 - 1000
1300 - ?
= 550 A

OR
Based on Input
[Std Input for Act output - Actual Input for actual output] x std Avg Cost per input
[1200-1300] X 6600 =550A
1200


2
€8,30
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
ddhruvaamish96

Maak kennis met de verkoper

Seller avatar
ddhruvaamish96 ICAI
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
1 jaar
Aantal volgers
0
Documenten
4
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen