logo-home

Lisaagus

On this page, you find all documents, package deals, and flashcards offered by seller lisaAgus.

Community

  • Followers
  • Following

4 Reviews received

1 items

LATEST CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) WITH 100% VERIFIED SOLUTIONS| ALREADY PASSED| 2024

(0)
$15.49
0x  sold

LATEST CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) WITH 100% VERIFIED SOLUTIONS| ALREADY PASSED| 2024 Stockpiles of aggregate shall be maintained in a well-drained condition in order to: Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at least how many hours prior to batch for FDOT? 24 Free moisture of the aggregate means: Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate.

i x
  • Exam (elaborations)
  •  • 10 pages • 
  • by lisaAgus • 
  • uploaded  15-05-2024
Quick View
i x