BSOP 429
Devry University
All 3 results
Sort by
-
BSOP 429 Week 8 Final Exam (Version 1) | 100% CORRECT SOLUTIONS.
- Exam (elaborations) • 8 pages • 2021
-
- $10.99
- + learn more
Page 1 (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 ho urs for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (TCO 3) Scheduling in service systems may i...
-
Exam (elaborations) BSOP 429
- Exam (elaborations) • 6 pages • 2021
-
- $13.49
- + learn more
1.	(TCO 12)	is the objective under JIT and time-based competition. (Points : 5) 
WIP reduction Material velocity Lead-time reduction 
Decreasing material wait time 
 
2.	(TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5) 
Run, move, and queue Move and queue 
Run and setup Move and setup 
3.	(TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5) 
Inventory decreases Inventory increases Inventory rema...
Too much month left at the end of the money?
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia