BSOP 429
Devry University
All 3 results
Sort by
-
BSOP 429 Week 8 Final Exam (Version 1) | 100% CORRECT SOLUTIONS.
- Exam (elaborations) • 8 pages • 2021
-
- $10.99
- + learn more
Page 1 (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 ho urs for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (TCO 3) Scheduling in service systems may i...
-
Exam (elaborations) BSOP 429
- Exam (elaborations) • 6 pages • 2021
-
- $13.49
- + learn more
1.	(TCO 12)	is the objective under JIT and time-based competition. (Points : 5) 
WIP reduction Material velocity Lead-time reduction 
Decreasing material wait time 
 
2.	(TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5) 
Run, move, and queue Move and queue 
Run and setup Move and setup 
3.	(TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5) 
Inventory decreases Inventory increases Inventory rema...
Fear of missing out? Then don’t!
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia