RTPM
Liberty University
All 8 results
Sort by
-
RTPM Test Questions And Answers (Answers Verifed 100%)
- Exam (elaborations) • 35 pages • 2023
-
- $10.99
- + learn more
RTPM Test Questions And Answers (Answers Verifed 100%)
-
RTPM Test Questions And Answers (Answers Verifed By Experts) 2022-2023
- Exam (elaborations) • 35 pages • 2023
-
- $9.49
- + learn more
RTPM Test Questions And Answers (Answers Verifed By Experts) 2022-2023
-
RTPM 497 EXAM #3 QUESTIONS WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 7 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
where did a 19 year old roadie die? correct answer: Roadie Dies at Avenged Sevenfold Germany Concert 
 
smartest thing you can so during planning process is to correct answer: conduct a SWOT analysis 
 
SWOT allows you to identify correct answer: internal and external influences 
 
SWOT primary objective correct answer: to help organizations develop a full awareness of all the factors involved in a decision. 
• A framework that allows managers to synthesize insights obtained from an inter...
-
BICSI RTPM TPMM book Chapters 2-4| 65 QUESTIONS| WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 5 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
What is the next step after completing the site survey and formulating a project implementation plan? correct answer: Hold an initial meeting with the entire ICT installation team. 
 
(2-5) 
 
What is the next step after completing the initial construction meeting? correct answer: Update project implementation plan, Conduct a pre-installation meeting (2-5) 
 
What type of meetings may occur daily, weekly, monthly, quarterly, or as 
necessary to ensure that team members know the status of the ...
-
Bicsi RTPM 002 section 1 Site Survey QUESTIONS WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 3 pages • 2023
-
Available in package deal
-
- $8.49
- + learn more
Pathway Considerations correct answer: In planning for OSP cabling, cable infrastructure must be determined irst. The choices are underground, direct-buried, and aerial. 
 
Underground plant correct answer: most expensive system, has the highest cable placement capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost 
 
Direct-buried plant correct answer: A lifespan of 30 years or shorter, depending on different conditions 
 
Aerial plant correct answer: Ae...
Make study stress less painful
-
BICSI RTPM Study for Telecommunication Project Manager| 301 QUESTIONS| WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 27 pages • 2023
-
Available in package deal
-
- $13.99
- 1x sold
- + learn more
design and implementation/installation correct answer: Telecommunications project management (TPM) typically consists of two distinct processes: 
 
Design PM Tasks correct answer: Review expression of interest for client 
Perform a user needs analysis 
Perform site surveys and meet with client 
Generate preliminary design submittals 
Respond to/incorporate client comments 
Prepare final bid documents/RFP and engineer's cost estimate 
Issue final RFP package to client 
Client makes RFP a...
-
RTPM STUDY GUIDE| 264 QUESTIONS| WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $13.99
- 1x sold
- + learn more
1. What are the two distinct processes of telecommunications project management? correct answer: design and implementation/instillation 
 
2. List the nine project constraints. correct answer: Cost, time, quality, risk, resources, stakeholders, technology, safety, environment 
 
3. In order for a project to run effectively and efficiently, the ICT professional should create a list of targeted objectives, identifying each _______________ as well as the _______________. correct answer: mileston...
-
RTPM Test Questions | 264 Questions | 100% Correct Answers
- Exam (elaborations) • 19 pages • 2022
-
- $12.49
- 5x sold
- + learn more
1. What are the two distinct processes of telecommunications project management? - 
design and implementation/instillation 
2. List the nine project constraints. - Cost, time, quality, risk, resources, 
stakeholders, technology, safety, environment 
3. In order for a project to run effectively and efficiently, the ICT professional should 
create a list of targeted objectives, identifying each _______________ as well as the 
_______________. - milestones, project's overall outcome 
4. The projec...