Aia contract - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aia contract? On this page you'll find 239 study documents about Aia contract.

Page 2 out of 239 results

Sort by

CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • Available in package deal
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $15.49
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $15.49
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
AIA - Contract Documents Exam Studyguide 2023-2024
  • AIA - Contract Documents Exam Studyguide 2023-2024

  • Exam (elaborations) • 32 pages • 2023
  • AIA - Contract Documents Exam Studyguide ...
    (0)
  • $11.49
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
CDT Exam questions and Answers 100%  Correct
  • CDT Exam questions and Answers 100% Correct

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • CDT Exam questions and Answers 100% Correct Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
    (0)
  • $17.99
  • + learn more
CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • Available in package deal
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $14.49
  • + learn more
CDT EXAM QUESTIONS AND ANSWERS
  • CDT EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 55 pages • 2023
  • Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer- Answer: C - Contractor. Safe...
    (0)
  • $14.49
  • + learn more
CNST 2341 fInal  Questions With 100% Correct Answers!!
  • CNST 2341 fInal Questions With 100% Correct Answers!!

  • Exam (elaborations) • 37 pages • 2024
  • Available in package deal
  • `serve as one point of responsibility to who? - the owner `The 3 method of payment are ? - 1. Lump Sum 2. Unit price 3. Cost Plus `total float or simply "float" is also referred to as a what - "slack" `With OCIPs and CCIPs the disadvantages of the programs includes what? - increased administration burden by the owner or contractor `With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must what? - Be paid for with private the owner. A certifi...
    (0)
  • $7.99
  • + learn more