Ans nfpa 72 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Ans nfpa 72? On this page you'll find 41 study documents about Ans nfpa 72.

Page 2 out of 41 results

Sort by

TCFP Inspector's Class II Exam QUESTIONS AND ANSWERS 2023 VERIFIED AND ALREADY PASSED
  • TCFP Inspector's Class II Exam QUESTIONS AND ANSWERS 2023 VERIFIED AND ALREADY PASSED

  • Exam (elaborations) • 19 pages • 2023
  • Which of the following are a type of sprinkler? A) ESFR B) EC C) AF D) A and B - CORRECT ANS A and B Foam water system design and installation requirements are regulated by ___________. A. NFPA 13 B. NFPA 13R C. NFPA 25 D. NFPA 16 - CORRECT ANS NFPA 16 True or False, NFPA 72 allows only manual pull stations and water flow detection devices to be used on shunt systems. Fire detection devices are not permitted. - CORRECT ANS True The fire alarm control panel (FACP) is essentially the...
    (0)
  • $10.99
  • + learn more
TCFP Inspector's Class II Exam QUESTIONS AND ANSWERS 2023 VERIFIED AND ALREADY PASSED
  • TCFP Inspector's Class II Exam QUESTIONS AND ANSWERS 2023 VERIFIED AND ALREADY PASSED

  • Exam (elaborations) • 19 pages • 2023
  • Which of the following are a type of sprinkler? A) ESFR B) EC C) AF D) A and B - CORRECT ANS A and B Foam water system design and installation requirements are regulated by ___________. A. NFPA 13 B. NFPA 13R C. NFPA 25 D. NFPA 16 - CORRECT ANS NFPA 16 True or False, NFPA 72 allows only manual pull stations and water flow detection devices to be used on shunt systems. Fire detection devices are not permitted. - CORRECT ANS True The fire alarm control panel (FACP) is essentially the...
    (0)
  • $12.49
  • + learn more
Florida Fire inspector one Practice test (use written response)
  • Florida Fire inspector one Practice test (use written response)

  • Exam (elaborations) • 15 pages • 2024
  • Florida Fire inspector one Practice test (use written response) The advantage of establishing a plans review process is that it: a. Allows the inspector to spend more time in the office. b. Created an additional opportunity for training and fire inspection. c. Enables the reviewer to point out discrepancies before construction begins. d. Increases the need for fire suppression activities. - ANS c. Enables the reviewer to point out discrepancies before construction begins. Dire detection...
    (0)
  • $9.68
  • + learn more
TCFP Inspector's Class II QUESTIONS AND ANSWERS 2023 VERIFIED AND ALREADY PASSED
  • TCFP Inspector's Class II QUESTIONS AND ANSWERS 2023 VERIFIED AND ALREADY PASSED

  • Exam (elaborations) • 17 pages • 2023
  • Which of the following are a type of sprinkler? A) ESFR B) EC C) AF D) A and B - CORRECT ANS A and B Foam water system design and installation requirements are regulated by ___________. A. NFPA 13 B. NFPA 13R C. NFPA 25 D. NFPA 16 - CORRECT ANS NFPA 16 True or False, NFPA 72 allows only manual pull stations and water flow detection devices to be used on shunt systems. Fire detection devices are not permitted. - CORRECT ANS True The fire alarm control panel (FACP) is essentially the...
    (0)
  • $10.99
  • + learn more
nfpa 99 2024 Questions With Complete Answers
  • nfpa 99 2024 Questions With Complete Answers

  • Exam (elaborations) • 9 pages • 2024
  • an existing system that is not in strict compliance with the provisions of this standard shall be permitted to be continued in use as long as the ____________ has determined that such use does not constitute a distinct hazard to life. - ANS authority having jurisdiction cylinder and cryogenic liquid container outlet connections shall be designed as to render the attachment point __________ when removal of the outlet connection is attempted. - ANS unusable which of the fol...
    (0)
  • $10.39
  • + learn more
NASCLA GC Exam Questions With 100% Correct Answers!!
  • NASCLA GC Exam Questions With 100% Correct Answers!!

  • Exam (elaborations) • 13 pages • 2024
  • NASCLA GC Exam Questions With 100% Correct Answers!! precast floor panel jacking - ANS removed when grout has hardened corbel - ANS used to support structural beams concrete panels - ANS help with rapid construction lift wall panels - ANS at edges dunnage continuous - ANS only for one stack value engineering - ANS only during design phase superintendent - ANS is responsible for "as built" drawings shop drawings - ANS fabricator or m...
    (0)
  • $8.28
  • + learn more
Federal Nursing Home Administrator Exam Questions And Answers
  • Federal Nursing Home Administrator Exam Questions And Answers

  • Exam (elaborations) • 18 pages • 2024
  • Federal Nursing Home Administrator Exam Questions And Answers 1) OBRA asserts some separate committees can be folded into the quality improvement/assurance committee. Safety, Pharmacy and which committee below can be added into QA/QI committee? - ANS Infection Control 2) Nursing homes are responsible for obtaining and providing dental care for residents. Who usually pays for dental services? - ANS The resident or a family member 3) A facility is not allowed to charge a r...
    (0)
  • $10.89
  • + learn more
 Latest Nicet Level 2 questions Rated 100%  With Complete Answers
  • Latest Nicet Level 2 questions Rated 100% With Complete Answers

  • Exam (elaborations) • 3 pages • 2024
  • 4 - ANS Consider a room which is 40' square. How many 15cd wall mounted strobes are required to adequately cover this space? Annually - ANS What is the testing frequency of a strobe? 15 - ANS In a corridor application, visible appliances shall be rated not less than ________ cd? 4 hours - ANS Consider a household fire alarm system where the primary power is provided by a circuit that can be switched off by means other than a circuit breaker. The batt...
    (0)
  • $10.39
  • + learn more
Egan's Fundamentals of Respiratory Care 10th Edition by Robert M. Kacmarek - Test Bank
  • Egan's Fundamentals of Respiratory Care 10th Edition by Robert M. Kacmarek - Test Bank

  • Exam (elaborations) • 989 pages • 2023
  • Chapter 03: Patient Safety, Communication, and Record Keeping Test Bank MULTIPLE CHOICE 1. Which of the following is/are a potential area of risk to patients receiving respiratory care? a. movement or ambulation b. electrical shock c. fire hazards d. all the above ANS: C The key areas of potential risk are (1) patient movement and ambulation, (2) electrical hazards, and (3) fire hazards. DIF: Recall REF: p. 42 OBJ: 2| 3 2. Lifting heavy objects is best done with whic...
    (0)
  • $24.12
  • + learn more
NFPA 72 2010 Prep for TFM12 Fire Alarm Technical Chapter 3 Definitions Questions & Answers 2023 ( A+ GRADED 100% VERIFIED)
  • NFPA 72 2010 Prep for TFM12 Fire Alarm Technical Chapter 3 Definitions Questions & Answers 2023 ( A+ GRADED 100% VERIFIED)

  • Exam (elaborations) • 32 pages • 2023
  • NFPA 72 2010 Prep for TFM12 Fire Alarm Technical Chapter 3 Definitions Questions & Answers 2023 ( A+ GRADED 100% VERIFIED)
    (0)
  • $6.99
  • + learn more