Cm 4100 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cm 4100? On this page you'll find 56 study documents about Cm 4100.

Page 2 out of 56 results

Sort by

SCM 410 Exam 2024/2025 with 100% correct answers
  • SCM 410 Exam 2024/2025 with 100% correct answers

  • Exam (elaborations) • 23 pages • 2024
  • supply chain A set of three or more entities (organizations or individuals) directly involved in the upstream and downstream flows of products, services, finances, and/or information from a source to a customer. Supply Chain Orientation The recognition by an organization of the systemic, strategic implications of the tactical activities involved in managing the various flows in a supply chain Previous Pause Next Rewind 10 seconds Move forward 10 seconds Unmute 0:08 / 0:...
    (0)
  • $16.99
  • + learn more
CM 4100 MODULE 1-6 QUIZZES
  • CM 4100 MODULE 1-6 QUIZZES

  • Exam (elaborations) • 5 pages • 2024
  • CM 4100 MODULE 1-6 QUIZZES
    (0)
  • $10.99
  • + learn more
cM 4100 Module 1-6 Quizzes and Answers 100% Correct
  • cM 4100 Module 1-6 Quizzes and Answers 100% Correct

  • Exam (elaborations) • 5 pages • 2024
  • cM 4100 Module 1-6 Quizzes and Answers 100% Correct A precedence diagram uses nodes to represent a. Activities b. Activity links c. Resources d. Time - CORRECT ANSWER-a. Activities A significant difference between "planning" and "scheduling" is, a.Scheduling determines what is going to be done, and planning determines how to do. a-Scheduling determines how to do, and planning determines what to do. a.Scheduling determines when to do, and planning determines what to do, how to do and...
    (0)
  • $14.99
  • + learn more
LSU CM 4100 Construction Scheduling and Cost Control quizz 6 2024-2025 Louisiana State University
  • LSU CM 4100 Construction Scheduling and Cost Control quizz 6 2024-2025 Louisiana State University

  • Exam (elaborations) • 4 pages • 2024
  • LSU CM 4100 Construction Scheduling and Cost Control quizz Louisiana State University
    (0)
  • $10.99
  • + learn more
CM 4100 Assignments Questions Solved 100% Correct
  • CM 4100 Assignments Questions Solved 100% Correct

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • The conditions of limited resource availability dictate certain activities cannot be performed simultaneously. This is, Select one: a. Physical constraints b. Resource constraints c. Safety constraints d. Contractual constraints - Answer Resource constraints
    (0)
  • $12.74
  • + learn more
CM 4101 Final Exam Prep Test Questions Answered 100% Correct
  • CM 4101 Final Exam Prep Test Questions Answered 100% Correct

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • Bar Charts - Answer simple and time scaled presentations that show how major work activities are scheduled advantages bar charts - Answer simple and easy to use disadvantages bar charts - Answer -cannot determine project status -cannot determine needs for adjustments -activites for acceleration cannot be determined -relies on extra links to show logical relationships between activities, otherwise relationships cannot be determined networks - Answer graphic representations using nodes and...
    (0)
  • $12.99
  • + learn more
CM 4101 Exam Questions Solved 100% Correct
  • CM 4101 Exam Questions Solved 100% Correct

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • What are graphic representations using nodes and links. - Answer Networks What is a discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. - Answer Activity What is the point in time or an instant at which the status of completion of a project or an activity can be defined. - Answer Even
    (0)
  • $12.74
  • + learn more
Final Exam Guide for CM 4100 Exam 1 Questions and Verified Solutions
  • Final Exam Guide for CM 4100 Exam 1 Questions and Verified Solutions

  • Exam (elaborations) • 2 pages • 2024
  • Final Exam Guide for CM 4100 Exam 1 Questions and Verified Solutions - CORRECT ANSWER- Activity - CORRECT ANSWER-I . usually takes time 2. may consume resources 3. usually has a start time and finish time 4. can be identified for planning, scheduling, monitoring and controlling the construction project ADM - CORRECT ANSWER-Arrow Diagramming Method (deterministic) Arrow Diagrams - CORRECT ANSWER-use links to represent activities, and nodes to represent events
    (0)
  • $11.99
  • + learn more
CM 4101 Final Exam | With 100% Correct Answers, Graded A
  • CM 4101 Final Exam | With 100% Correct Answers, Graded A

  • Exam (elaborations) • 7 pages • 2024
  • CM 4101 Final Exam | With 100% Correct Answers, Graded A During which of the following process, questions such as what activities should be scheduled are typically asked and answered? a. Planning b. Scheduling c. Control Using traditional bar charts, it is always easy to tell the logic relationships between activities. a. True b. False An event consumes a. Resources b. Time c. Both Resources and Time d. Neither resources nor time Which of the following is correct regarding CPM and PERT? a. The...
    (0)
  • $15.99
  • + learn more
CM 4101 final Exam Questions Solved 100% Correct
  • CM 4101 final Exam Questions Solved 100% Correct

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • work breakdown structure - Answer a _______ provides a framework for breaking a project down into successively greater detail by level and organizing activities that make up a project sequencing, scheduling - Answer a WBS organizes the work of a project but does not address the _____ and the _____ of project activities
    (0)
  • $12.99
  • + learn more