Cosc 275 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275? On this page you'll find 150 study documents about Cosc 275.

Page 2 out of 150 results

Sort by

COSC 275 Detailed Exam With Complete Solution
  • COSC 275 Detailed Exam With Complete Solution

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • COSC 275 Detailed Exam With Complete Solution...
    (0)
  • $14.99
  • + learn more
COSC 275 Exam 1 Palmer Questions and Answers
  • COSC 275 Exam 1 Palmer Questions and Answers

  • Exam (elaborations) • 10 pages • 2024
  • COSC 275 Exam 1 Palmer Questions and Answers
    (0)
  • $11.99
  • + learn more
COSC 275 FINAL EXAM Palmer  Question with 100 % correct answers | Verified
  • COSC 275 FINAL EXAM Palmer Question with 100 % correct answers | Verified

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Addendum - A document describing an addition, change, correction, or modification to contract documents. An addendum is issued by the design professional during the bidding period or prior to the award of contract, and is the primary method of informing bidders of modifications to the work during the bidding process. Addenda become part of the contract documents (Finish x Thickness)/27 - CY of Concrete 20/80 rule - 80% of time is used for 20% of take-off 30 amps with 2 breakers - ex. 30/2 ...
    (0)
  • $7.99
  • + learn more
COSC 275 Exam 1 Palmer Solved 100%
  • COSC 275 Exam 1 Palmer Solved 100%

  • Exam (elaborations) • 10 pages • 2024
  • COSC 275 Exam 1 Palmer Solved 100%
    (0)
  • $11.49
  • + learn more
COSC 275 PALMER EXAM STUDYGUIDE 2024
  • COSC 275 PALMER EXAM STUDYGUIDE 2024

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • COSC 275 PALMER EXAM STUDYGUIDE 2024...
    (0)
  • $9.49
  • + learn more
COSC 275 Exam 2 (Palmer) Questions with Correct Answers
  • COSC 275 Exam 2 (Palmer) Questions with Correct Answers

  • Exam (elaborations) • 11 pages • 2024
  • Hard bid low price Correct Answer-Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Correct Answer-Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR Correct Answer-Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. Design Build Correct Answer-Only one co...
    (0)
  • $12.99
  • + learn more
COSC 275 Final Exam Palmer Study Guide With Complete Solution
  • COSC 275 Final Exam Palmer Study Guide With Complete Solution

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • COSC 275 Final Exam Palmer Study Guide With Complete Solution...
    (0)
  • $12.99
  • + learn more
COSC 275 Final Exam Palmer With Solution
  • COSC 275 Final Exam Palmer With Solution

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • COSC 275 Final Exam Palmer With Solution...
    (0)
  • $10.99
  • + learn more
COSC 275 Exam 2 Palmer; Questions and  Answers % Correct
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct Measures Correct answer-1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle Correct answer-Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle Correct answer-Area: B*1/2H
    (0)
  • $11.99
  • + learn more
COSC 275 Exam 1 Palmer | Latest Update | 2024/2025 | Rated A+
  • COSC 275 Exam 1 Palmer | Latest Update | 2024/2025 | Rated A+

  • Exam (elaborations) • 21 pages • 2024
  • COSC 275 Exam 1 Palmer | Latest Update | 2024/2025 | Rated A+ Liquid Limit: (LL) is the moisture content expressed as a percentage of the weight of oven dried soil, at which soil changes from a plastic to a liquid state. Plasticity Index: Range of moisture in which a soil remains in a plastic state, while passing from a semisolid state to a liquid state. Overburden: The soil above the layer or layers being investigated. The material (soil) that must be removed from subgrade to top of...
    (0)
  • $9.92
  • + learn more