Cosc 275 palmer exam 1 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275 palmer exam 1? On this page you'll find 28 study documents about Cosc 275 palmer exam 1.

Page 2 out of 28 results

Sort by

COSC 275 Exam 1 Palmer Questions and Answers 100% Accurate
  • COSC 275 Exam 1 Palmer Questions and Answers 100% Accurate

  • Exam (elaborations) • 10 pages • 2024
  • COSC 275 Exam 1 Palmer
    (0)
  • $17.99
  • + learn more
COSC 275 Exam 1 Palmer Questions and Answers Latest Updated
  • COSC 275 Exam 1 Palmer Questions and Answers Latest Updated

  • Exam (elaborations) • 10 pages • 2024
  • COSC 275 Exam 1 Palmer
    (0)
  • $15.49
  • + learn more
COSC 275 Exam 2 Palmer; Questions and  Answers % Correct
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct Measures Correct answer-1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle Correct answer-Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle Correct answer-Area: B*1/2H
    (0)
  • $11.99
  • + learn more
COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
  • COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • COSC 275 Exam 1 Palmer Questions and answers rated A+ 2024/2025
    (0)
  • $11.49
  • + learn more
COSC 275 Final Exam Palmer Questions And Answers 100% Verified.
  • COSC 275 Final Exam Palmer Questions And Answers 100% Verified.

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Final Exam Palmer Questions And Answers 100% Verified. Estimating - answerThe process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off - answerThe process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities - answerMeasured amounts of c...
    (0)
  • $11.49
  • + learn more
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified. Measures - answer1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - answerCircumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - answerArea: B*1/2H Masterformat 2004: 00 - answerProcurement and Contracting Requirements Masterformat 2004: 01 - answerGeneral Requirements Masterformat 2004: 02 - answerExisting Conditions Masterformat 2004: 03 - ans...
    (0)
  • $10.49
  • + learn more
COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025  | Graded A+
  • COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+

  • Exam (elaborations) • 15 pages • 2024
  • COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+ 1 kg= ___ lbs 2.2046 1 sq M= ___ sq ft 10.764 1"= ___ millimeters 25.40 4 types of envelope construction Tilt Wall Stud with veneer Masonry Glass A 10' W18x48 Beam weighs how much? (in tons) 10x48 = 480 lbs 480/2000 = .24 tons Air Barrier A component of the envelop system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and flui...
    (0)
  • $9.96
  • + learn more
COSC 275 Palmer: Exam 1 Notes 2024
  • COSC 275 Palmer: Exam 1 Notes 2024

  • Exam (elaborations) • 8 pages • 2024
  • COSC 275 Palmer: Exam 1 Notes 2024 Estimating - Correct Answer️️ -The Process of determining the anticipated cost of material, labor and equipment of a proposed project. Take-off - Correct Answer️️ -The process in which detailed lists are compiled, based on drawings and specifications, of all the materials and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities - Correct Answer️️ -Mea...
    (0)
  • $12.49
  • + learn more
COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+

  • Exam (elaborations) • 18 pages • 2024
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+ (Finish x Thickness)/27 CY of Concrete 20/80 rule 80% of time is used for 20% of take-off 30 amps with 2 breakers ex. 30/2 43,560 1 acre of land = ? SF Active soil Soil that swells when it comes in contact with water. Addendum A document describing an addition, change, correction, or modification to contract documents. An addendum is issued by the design professional during the bidding period or prior to the ...
    (0)
  • $9.96
  • + learn more
COSC 275 Exam 1 - TAMU Palmer Questions and Answers
  • COSC 275 Exam 1 - TAMU Palmer Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • COSC 275 Exam 1 - TAMU Palmer Questions and Answers Pounds per square inch - Correct Answer️️ -PSI Not in contract - Correct Answer️️ -NIC cubic yard - Correct Answer️️ -CY Linear Foot (feet) - Correct Answer️️ -LF Unless Noted Otherwise - Correct Answer️️ -UNO Square Foot (feet) - Correct Answer️️ -SF Each - Correct Answer️️ -EA Typical - Correct Answer️️ -TYP Not to scale - Correct Answer️️ -NTS .08 - Correct Answer️️ -1" .17 - Correct Answe...
    (0)
  • $11.49
  • + learn more